Bill Text: TX HB5297 | 2023-2024 | 88th Legislature | Introduced
Bill Title: Relating to the interconnection of the ERCOT power grid to grids outside the ERCOT power region.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced) 2023-03-24 - Referred to State Affairs [HB5297 Detail]
Download: Texas-2023-HB5297-Introduced.html
88R14140 JXC-D | ||
By: Bryant | H.B. No. 5297 |
|
||
|
||
relating to the interconnection of the ERCOT power grid to grids | ||
outside the ERCOT power region. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Subtitle B, Title 2, Utilities Code, is amended | ||
by adding Chapter 39A to read as follows: | ||
CHAPTER 39A. INTERCONNECTION OF FACILITIES IN ERCOT TO GRIDS | ||
OUTSIDE ERCOT POWER REGION | ||
Sec. 39A.0101. UTILITY AND COOPERATIVE AUTHORITY. | ||
Notwithstanding any other law, a transmission and distribution | ||
utility, municipally owned utility, or electric cooperative that | ||
transmits or distributes power purchased at wholesale in the ERCOT | ||
power region may construct, own, and operate facilities as | ||
necessary to: | ||
(1) access transmission service from outside of the | ||
ERCOT power region; and | ||
(2) purchase power at wholesale from outside of the | ||
ERCOT power region. | ||
Sec. 39A.0102. COMMISSION AUTHORITY. (a) The commission | ||
may request any federal approval necessary for the interconnection | ||
of a facility described by Section 39A.0101. | ||
(b) Unless otherwise provided by federal law, the | ||
commission shall require the independent organization certified | ||
for the ERCOT power region under Section 39.151 to approve the | ||
interconnection of a facility described by Section 39A.0101 unless | ||
the commission or the independent organization determines that the | ||
interconnection poses a significant and imminent risk to public | ||
health and safety. | ||
(c) The commission may provide technical and administrative | ||
assistance to a transmission and distribution utility, municipally | ||
owned utility, or electric cooperative seeking to construct, own, | ||
or operate a facility described by Section 39A.0101. | ||
(d) The commission may approve wholesale electricity | ||
transactions between entities in the ERCOT power region and | ||
entities outside the ERCOT power region. | ||
Sec. 39A.0103. SYNCHRONOUS AND NON-SYNCHRONOUS | ||
INTERCONNECTIONS. (a) This chapter applies to synchronous and | ||
non-synchronous interconnections. | ||
(b) Unless otherwise provided by federal law, the | ||
commission shall approve an application for a certificate of | ||
convenience and necessity submitted under Section 39A.0104 by a | ||
transmission and distribution utility, municipally owned utility, | ||
or electric cooperative for a facility that would synchronously | ||
interconnect to a facility outside the ERCOT power region if the | ||
application complies with all applicable provisions of Chapter 37 | ||
and this chapter. | ||
SECTION 2. Sections 37.051(c-1), (c-2), and (c-3), | ||
Utilities Code, are redesignated as Section 39A.0104, Utilities | ||
Code, and amended to read as follows: | ||
Sec. 39A.0104. CERTIFICATES OF CONVENIENCE AND NECESSITY. | ||
(a) A transmission and distribution utility, [ |
||
electric cooperative may not interconnect a facility described by | ||
Section 39A.0101 [ |
||
certificate from the commission in the manner provided by Chapter | ||
37 and this chapter stating that the interconnection does not pose a | ||
significant and imminent risk to public health and safety [ |
||
(b) In the case of a conflict between Chapter 37 and this | ||
chapter, this chapter prevails. | ||
(c) Sections 37.056(c)(1) and (2) and (d) do not apply to an | ||
application for a certificate described by Subsection (a). | ||
(d) Unless otherwise provided by federal law, the | ||
commission shall approve an application for a certificate described | ||
by Subsection (a) unless the commission determines that granting | ||
the application poses a significant and imminent risk to public | ||
health and safety. | ||
(e) The transmission and distribution utility, municipally | ||
owned utility, or electric cooperative [ |
||
commission for a [ |
||
later than the 180th day before the date the utility or cooperative | ||
[ |
||
Commission related to the interconnection. | ||
(f) [ |
||
[ |
||
the date the application is filed, shall approve an application | ||
[ |
||
constructed under an interconnection agreement appended to an offer | ||
of settlement approved in a final order of the Federal Energy | ||
Regulatory Commission that was issued in Docket No. TX11-01-001 on | ||
or before December 31, 2014, directing physical connection between | ||
the ERCOT and SERC regions under Sections 210, 211, and 212 of the | ||
Federal Power Act (16 U.S.C. Sections 824i, 824j, and 824k). In | ||
approving the application, the commission may prescribe reasonable | ||
conditions to protect the public interest that are consistent with | ||
the final order of the Federal Energy Regulatory Commission. | ||
(g) [ |
||
the independent organization certified under Section 39.151 for the | ||
ERCOT power region to adopt rules or protocols of general | ||
applicability. | ||
SECTION 3. (a) It is the intent of the legislature that the | ||
ERCOT power region become synchronously interconnected to other | ||
power regions not later than December 31, 2030. | ||
(b) Not later than October 1, 2024, the Public Utility | ||
Commission of Texas shall examine the laws and rules governing the | ||
entities and facilities described by Section 39A.0101, Utilities | ||
Code, as added by this Act, and submit a report to the legislature | ||
with recommendations for legislative and administrative action | ||
needed to facilitate the interconnection of facilities in the ERCOT | ||
power region with other power regions. | ||
(c) Not later than October 1, 2024, the comptroller of | ||
public accounts shall conduct a study on the costs to the public and | ||
this state of the power outages that occurred as a result of Winter | ||
Storm Uri. The study must include an estimate of the average cost | ||
per household in the ERCOT power region and a comparison of those | ||
costs to costs incurred by households in other states that | ||
experienced power outages from Winter Storm Uri. | ||
SECTION 4. This Act takes effect September 1, 2023. |