Bill Text: TX HB2899 | 2021-2022 | 87th Legislature | Introduced


Bill Title: Relating to the creation of a task force to improve the reliability of electric service in this state.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2021-03-18 - Referred to State Affairs [HB2899 Detail]

Download: Texas-2021-HB2899-Introduced.html
  87R11760 JXC-D
 
  By: Lopez H.B. No. 2899
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to the creation of a task force to improve the reliability
  of electric service in this state.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  (a) The Texas Grid Task Force is established to
  evaluate the regulation of the provision of electric services in
  this state in the manner provided by this Act.
         (b)  The governor shall appoint the members of the Texas Grid
  Task Force. The membership must include:
               (1)  the Texas state climatologist;
               (2)  a person to represent the Railroad Commission of
  Texas;
               (3)  a person to represent the independent organization
  certified under Section 39.151, Utilities Code, for the ERCOT power
  region;
               (4)  a person to represent the Public Utility
  Commission of Texas;
               (5)  a person to represent the Energy Systems
  Laboratory of the Texas A&M Engineering Experiment Station;
               (6)  a member of the house state affairs committee;
               (7)  a member of the senate state affairs committee;
               (8)  a member of the house energy resources committee;
               (9)  a member of the senate natural resources and
  economic development committee; and
               (10)  a person to represent the electric energy
  industry.
         (c)  The Texas Grid Task Force shall examine information
  included in and recommendations made in previous reports issued by
  the independent organization certified under Section 39.151,
  Utilities Code, for the ERCOT power region, the Sunset Advisory
  Commission, the Public Utility Commission of Texas, the Federal
  Energy Regulatory Commission, and the North American Electric
  Reliability Corporation about improving the reliability of
  electric service in this state, including:
               (1)  winterization of generation assets and
  transmission and distribution facilities;
               (2)  electric energy storage capacities;
               (3)  how the relative reliability of generation sources
  affects the calculation of the ERCOT power region reserve margin;
  and
               (4)  the implementation of rolling blackouts and the
  related designation of critical infrastructure.
         (d)  Not later than January 1, 2022, the Texas Grid Task
  Force shall submit to the Public Utility Commission of Texas and to
  the legislature recommended changes to statutes and rules to
  improve the reliability of electric service in this state.
         (e)  Not later than April 1, 2022, the Public Utility
  Commission of Texas shall initiate a rulemaking proceeding if
  necessary to implement the recommendations of the Texas Grid Task
  Force.
         SECTION 2.  This Act takes effect September 1, 2021.
feedback