Bill Text: TX HB2481 | 2021-2022 | 87th Legislature | Introduced


Bill Title: Relating to the winter weather emergency preparedness of gas pipeline facilities and facilities for providing electric service.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2021-03-16 - Referred to State Affairs [HB2481 Detail]

Download: Texas-2021-HB2481-Introduced.html
  87R10871 JXC-D
 
  By: Reynolds H.B. No. 2481
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to the winter weather emergency preparedness of gas
  pipeline facilities and facilities for providing electric service.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Subchapter A, Chapter 35, Utilities Code, is
  amended by adding Section 35.0021 to read as follows:
         Sec. 35.0021.  WINTER WEATHER EMERGENCY PREPAREDNESS. The
  commission by rule shall require each provider of generation in the
  ERCOT power region to implement measures to prepare generation
  facilities to provide adequate electric generation service during a
  winter weather emergency.
         SECTION 2.  Subchapter D, Chapter 38, Utilities Code, is
  amended by adding Section 38.074 to read as follows:
         Sec. 38.074.  WINTER WEATHER EMERGENCY PREPAREDNESS. The
  commission by rule shall require each electric cooperative,
  municipally owned utility, and transmission and distribution
  utility providing transmission or distribution service in the ERCOT
  power region to implement measures to prepare facilities to
  maintain service quality and reliability during a winter weather
  emergency.
         SECTION 3.  Section 121.2015(a), Utilities Code, is amended
  to read as follows:
         (a)  The railroad commission shall adopt rules regarding:
               (1)  public education and awareness relating to gas
  pipeline facilities; [and]
               (2)  community liaison for responding to an emergency
  relating to a gas pipeline facility; and
               (3)  measures gas pipeline facility operators must
  implement to prepare gas pipeline facilities to maintain service
  quality and reliability during a winter weather emergency.
         SECTION 4.  This Act takes effect September 1, 2021.
feedback