Bill Text: TX HB2422 | 2021-2022 | 87th Legislature | Introduced


Bill Title: Relating to the regulation of aggregate production operations by the commissioners court in certain counties.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2021-03-16 - Referred to Environmental Regulation [HB2422 Detail]

Download: Texas-2021-HB2422-Introduced.html
  87R9564 MP-D
 
  By: Zwiener H.B. No. 2422
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to the regulation of aggregate production operations by
  the commissioners court in certain counties.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  The heading to Chapter 28A, Water Code, is
  amended to read as follows:
  CHAPTER 28A. REGULATION [REGISTRATION AND INSPECTION] OF CERTAIN
  AGGREGATE PRODUCTION OPERATIONS
         SECTION 2.  Section 28A.001(1), Water Code, is amended to
  read as follows:
               (1)  "Aggregate production operation" means the site
  from which aggregates are being or have been removed or extracted
  from the earth, including the entire areas of extraction, stripped
  areas, haulage ramps, and the land on which the plant processing the
  raw materials is located, exclusive of any land owned or leased by
  the responsible party not being currently used in the production of
  aggregates.  For the purposes of this chapter, the term "aggregate
  production operation" includes a quarry producing aggregates. For
  the purposes of this chapter, the term "aggregate production
  operation" does not include:
                     (A)  a site at which the materials that are being
  removed or extracted from the earth are used or processed at the
  same site or at a related site under the control of the same
  responsible party for the production of cement or lightweight
  aggregates, or in a lime kiln;
                     (B)  a temporary site that is being used solely to
  provide aggregate products for use in a public works project
  involving the Texas Department of Transportation or a local
  governmental entity;
                     (C)  an extraction area from which all raw
  material is extracted for use as fill or for other construction uses
  at the same or a contiguous site;
                     (D)  a site at which the materials that are being
  removed or extracted from the earth are used or processed for use in
  the construction, modification, or expansion of a solid waste
  facility at the site or another location; or
                     (E)  a site at which:
                           (i)  the materials being removed or
  extracted from the earth are specialty or terrazzo-type 
  [terrazo-type] stone removed or extracted exclusively for
  decorative or artistic uses; and
                           (ii)  the portion of the specialty or
  terrazzo-type [terrazo-type] stone horizon that is exposed for
  current production for commercial sale in the site does not exceed
  five acres.
         SECTION 3.  The heading to Subchapter B, Chapter 28A, Water
  Code, is amended to read as follows:
  SUBCHAPTER B. REGISTRATION, [AND] INSPECTION, AND OPERATION
         SECTION 4.  Subchapter B, Chapter 28A, Water Code, is
  amended by adding Section 28A.055 to read as follows:
         Sec. 28A.055.  LOCATION OF AGGREGATE PRODUCTION OPERATIONS
  IN CERTAIN COUNTIES. (a) This section applies only to:
               (1)  a county with a population of 500,000 or more; or
               (2)  a county that:
                     (A)  is adjacent to a county with a population of
  500,000 or more; and
                     (B)  according to the most recent federal
  decennial census, had population growth of more than 30 percent
  during the decade preceding the most recent federal decennial
  census.
         (b)  The county commissioners court by order may prohibit the
  construction or expansion of an aggregate production operation at a
  location less than one mile from a residence, school, place of
  worship, hospital, or land platted for residential development and
  may establish conditions on the construction or expansion of an
  aggregate production operation for other locations in the county
  based on development patterns of the county, distance of an
  operation from a roadway, traffic conditions, emission of dust from
  an operation, or public safety.
         (c)  An order adopted under this section may not result in a
  prohibition on the construction or expansion of aggregate
  production operations in the county.
         SECTION 5.  The changes in law made by this Act apply only to
  the construction or expansion of an aggregate production operation
  that begins on or after the effective date of this Act. The
  construction or expansion of an aggregate production operation that
  begins before the effective date of this Act is governed by the law
  in effect immediately before the effective date of this Act, and the
  former law is continued in effect for that purpose.
         SECTION 6.  This Act takes effect September 1, 2021.