Bill Text: TX HB1913 | 2021-2022 | 87th Legislature | Introduced
Bill Title: Relating to a requirement that an applicant for a permit to drill an oil or gas well submit a gas capture plan for the well.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2021-03-15 - Referred to Energy Resources [HB1913 Detail]
Download: Texas-2021-HB1913-Introduced.html
87R3731 ANG-D | ||
By: Hinojosa | H.B. No. 1913 |
|
||
|
||
relating to a requirement that an applicant for a permit to drill an | ||
oil or gas well submit a gas capture plan for the well. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Subchapter F, Chapter 86, Natural Resources | ||
Code, is amended by adding Section 86.186 to read as follows: | ||
Sec. 86.186. GAS CAPTURE PLAN. (a) The commission may not | ||
issue a permit to drill, deepen, plug back, or reenter an oil or gas | ||
well unless the applicant submits with the application a gas | ||
capture plan to minimize flaring from the well. | ||
(b) The gas capture plan must include: | ||
(1) the volume of gas anticipated to be produced from | ||
the well annually, measured in thousands of cubic feet; | ||
(2) the volume of oil anticipated to be produced from | ||
the well annually, measured in barrels; | ||
(3) the volume of condensate anticipated to be | ||
produced from the well annually, measured in barrels; | ||
(4) a detailed map depicting each existing, planned, | ||
and anticipated gas gathering system in the general area of the | ||
well; | ||
(5) the following information with regard to the gas | ||
gathering system that the operator of the well has contracted to use | ||
or, if the operator has not entered into a contract, the gas | ||
gathering system that is closest to the well: | ||
(A) the name of the operator of the gas gathering | ||
system; | ||
(B) a description of the approximate route of the | ||
pipeline required to connect the well to the gas gathering system; | ||
(C) the distance in feet of the pipeline required | ||
to connect the well to the gas gathering system; | ||
(D) the volume of gas in thousands of cubic feet | ||
per day that the gas gathering system is capable of transporting; | ||
(E) the volume of gas in thousands of cubic feet | ||
per day that the gas gathering system is currently transporting; | ||
(F) the volume of gas in thousands of cubic feet | ||
per day that the gas gathering system is anticipated to be | ||
transporting on the date of first sale of gas from the well; | ||
(G) the reliability of the gas gathering system, | ||
including the average annual downtime of the system; and | ||
(H) the name and location of the gas processing | ||
plant that receives or is anticipated to receive gas from the gas | ||
gathering system; | ||
(6) any plans for expanding the gas gathering systems | ||
in the general area of the well; | ||
(7) any other issues affecting the gathering of gas in | ||
the general area of the well; | ||
(8) a plan for connecting the well to a gas gathering | ||
system, including: | ||
(A) a description of any potential right-of-way | ||
issues; | ||
(B) the schedule for constructing any necessary | ||
gas gathering facilities; | ||
(C) the date a gas gathering line will be | ||
available; | ||
(D) a statement of whether the gas gathering | ||
system described by Subdivision (5) has the capacity to accept the | ||
volume of gas anticipated to be produced from the well at the time | ||
of application for the permit; and | ||
(E) a description of any discussions the operator | ||
of the well has had with other upstream operators regarding the | ||
construction or availability of a gas gathering line; and | ||
(9) a description of any options available to the | ||
operator of the well for the beneficial use of gas from the well if | ||
the well cannot be connected to a gas gathering system, including: | ||
(A) on-site use of the gas; | ||
(B) the processing of liquids in the gas; | ||
(C) the use of the gas for electric power | ||
generation; | ||
(D) the conversion of the gas to liquid fuels; | ||
(E) the compression of the gas on the lease on | ||
which the well is located; | ||
(F) the reinjection of the gas for underground | ||
storage; | ||
(G) the reinjection of the gas for temporary | ||
storage; | ||
(H) the reinjection of the gas for enhanced oil | ||
recovery; and | ||
(I) shutting in the well, taking into account the | ||
effect of doing so on the reservoir as well as public health, | ||
safety, and the environment. | ||
SECTION 2. The change in law made by this Act applies only | ||
to a permit the application for which is filed with the Railroad | ||
Commission of Texas on or after the effective date of this Act. A | ||
permit the application for which is filed before the effective date | ||
of this Act is subject to the law in effect on the date the | ||
application is filed, and that law is continued in effect for that | ||
purpose. | ||
SECTION 3. This Act takes effect September 1, 2021. |