Bill Text: OH SB300 | 2011-2012 | 129th General Assembly | Introduced
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: To designate the bridge spanning the Vermillion River, that is part of State Route 113, as the "Staff Sgt. James P. Hunter Memorial Bridge" and to designate a portion of State Route 800 in Harrison County as the "Trooper George Conn Memorial Highway."
Spectrum: Slight Partisan Bill (Republican 41-25)
Status: (Passed) 2013-03-13 - Effective Date [SB300 Detail]
Download: Ohio-2011-SB300-Introduced.html
As Introduced
A BILL
BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF OHIO:
Bill Title: To designate the bridge spanning the Vermillion River, that is part of State Route 113, as the "Staff Sgt. James P. Hunter Memorial Bridge" and to designate a portion of State Route 800 in Harrison County as the "Trooper George Conn Memorial Highway."
Spectrum: Slight Partisan Bill (Republican 41-25)
Status: (Passed) 2013-03-13 - Effective Date [SB300 Detail]
Download: Ohio-2011-SB300-Introduced.html
|
|
Senators Manning, Wagoner
Cosponsors:
Senators Brown, Hughes, Seitz
To enact section 5533.181 of the Revised Code to | 1 |
designate the bridge spanning the Vermillion | 2 |
River, that is part of State Route 113, as the | 3 |
"Staff Sgt. James P. Hunter Memorial Bridge." | 4 |
BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF OHIO:
Section 1. That section 5533.181 of the Revised Code be | 5 |
enacted to read as follows: | 6 |
Sec. 5533.181. The bridge spanning the Vermillion river, | 7 |
located in the community of Birmingham in Erie county and being a | 8 |
part of the highway known as state route number one hundred | 9 |
thirteen, shall be known as the "Staff Sgt. James P. Hunter | 10 |
Memorial Bridge." | 11 |
The director of transportation may erect suitable markers | 12 |
upon the bridge or its approaches indicating its name. | 13 |