Bill Text: NY S08109 | 2017-2018 | General Assembly | Amended
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Creates the "Finger Lakes community act of 2018"; prohibits the siting of newly constructed incineration facilities in the Finger Lakes region.
Spectrum: Bipartisan Bill
Status: (Engrossed - Dead) 2018-06-18 - referred to energy [S08109 Detail]
Download: New_York-2017-S08109-Amended.html
Bill Title: Creates the "Finger Lakes community act of 2018"; prohibits the siting of newly constructed incineration facilities in the Finger Lakes region.
Spectrum: Bipartisan Bill
Status: (Engrossed - Dead) 2018-06-18 - referred to energy [S08109 Detail]
Download: New_York-2017-S08109-Amended.html
STATE OF NEW YORK ________________________________________________________________________ 8109--A IN SENATE March 29, 2018 ___________ Introduced by Sens. HELMING, AVELLA, HAMILTON, O'MARA, ROBACH, YOUNG -- read twice and ordered printed, and when printed to be committed to the Committee on Energy and Telecommunications -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee AN ACT to create a prohibition against alternative waste to energy facilities that apply for approvals but that do not demonstrate a compelling public purpose and that would have a significant and adverse environmental impact that cannot be mitigated The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. Notwithstanding any law, rule or regulation to the contra- 2 ry, no major electric generating facility which generates electricity 3 from the combustion, gasification or pyrolysis of solid waste or from 4 fuel derived from solid waste can be issued a certificate of compatibil- 5 ity and public need or receive a negative declaration under the New York 6 State Environmental Quality Review Act process if any of the following 7 criteria exist or are met: 8 a. It poses a risk to the public health and safety of a community 9 within an environmentally sensitive area of the state; and 10 b. It is within 10 miles of a priority waterbody as designated by the 11 state: 12 (i) as a critical source of drinking water and tourism driver; and 13 (ii) as having vulnerabilities to Harmful Algal Blooms; and 14 c. Is within a thriving agriculture-tourism region in the state serv- 15 ing as an economic engine with over one billion dollars ($1,000,000,000) 16 of investment in the region and has created over 25,000 jobs; and 17 d. There are existing state approved landfills or other solid waste 18 management facilities operating within a 50 mile radius of the proposed 19 site; and 20 e. There is a significant impact to the access roads surrounding the 21 proposed site created by the additional traffic and transportation of 22 materials associated with the proposed project as determined by munici- 23 pal department of public works; and EXPLANATION--Matter in italics (underscored) is new; matter in brackets [] is old law to be omitted. LBD14900-08-8S. 8109--A 2 1 f. It does not demonstrate a compelling public purpose; and 2 g. The project can be located on an alternative site that does not 3 pose an environmental or economic threat to the region. 4 § 2. This act shall take effect immediately and shall be deemed to 5 have been in full force and effect on and after February 1, 2018.