Bill Text: NY S05175 | 2017-2018 | General Assembly | Introduced
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Prohibits the commissioner of general services from leasing or granting certain property rights to any entity to lay electric transmission lines when such lines transmit energy over an electric transmission line that interconnects a location outside of the United States when the transmission does not provide access to electric generating facilities within the state.
Spectrum: Partisan Bill (Republican 4-0)
Status: (Engrossed - Dead) 2018-06-20 - COMMITTED TO RULES [S05175 Detail]
Download: New_York-2017-S05175-Introduced.html
Bill Title: Prohibits the commissioner of general services from leasing or granting certain property rights to any entity to lay electric transmission lines when such lines transmit energy over an electric transmission line that interconnects a location outside of the United States when the transmission does not provide access to electric generating facilities within the state.
Spectrum: Partisan Bill (Republican 4-0)
Status: (Engrossed - Dead) 2018-06-20 - COMMITTED TO RULES [S05175 Detail]
Download: New_York-2017-S05175-Introduced.html
STATE OF NEW YORK ________________________________________________________________________ 5175 2017-2018 Regular Sessions IN SENATE March 10, 2017 ___________ Introduced by Sen. O'MARA -- read twice and ordered printed, and when printed to be committed to the Committee on Investigations and Govern- ment Operations AN ACT to amend the public lands law, in relation to the authority to grant property rights The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. Section 3 of the public lands law is amended by adding a 2 new subdivision 8 to read as follows: 3 8. Notwithstanding any law, rule, regulation, policy, order or execu- 4 tive action to the contrary, the commissioner of general services shall 5 not lease, or grant rights or easements to, the bed of Lake Champlain 6 and to the bed of the Hudson River to any individual, trustee, partner- 7 ship, association, corporation, company, municipality, political subdi- 8 vision or other legal entity for laying an electric transmission line, 9 including but not limited to a high voltage direct current electric 10 transmission line, that enters commercial operation after the effective 11 date of this subdivision, if such transmission line interconnects a 12 location outside the territorial limits of the United States to a 13 location within the state and such transmission line does not provide 14 access within the state to electric generating facilities located within 15 the state to transmit energy to a location within the state. 16 § 2. This act shall take effect immediately. EXPLANATION--Matter in italics (underscored) is new; matter in brackets [] is old law to be omitted. LBD10438-01-7