Bill Text: NY S05149 | 2013-2014 | General Assembly | Amended
Bill Title: Directs the public service commission to conduct a study to analyze the economic and environmental benefits from and the economic cost burden, if any, of the net energy metering program in this state.
Spectrum: Bipartisan Bill
Status: (Passed) 2014-12-17 - SIGNED CHAP.510 [S05149 Detail]
Download: New_York-2013-S05149-Amended.html
S T A T E O F N E W Y O R K ________________________________________________________________________ 5149--A Cal. No. 71 2013-2014 Regular Sessions I N S E N A T E May 10, 2013 ___________ Introduced by Sens. MAZIARZ, DeFRANCISCO, MONTGOMERY, PARKER, RANZENHOF- ER, SAMPSON -- read twice and ordered printed, and when printed to be committed to the Committee on Energy and Telecommunications -- recom- mitted to the Committee on Energy and Telecommunications in accordance with Senate Rule 6, sec. 8 -- reported favorably from said committee, ordered to first and second report, ordered to a third reading, passed by Senate and delivered to the Assembly, recalled, vote reconsidered, restored to third reading, amended and ordered reprinted, retaining its place in the order of third reading AN ACT to amend the public service law, in relation to a study by the public service commission on net metering THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM- BLY, DO ENACT AS FOLLOWS: 1 Section 1. The public service law is amended by adding a new section 2 66-n to read as follows: 3 S 66-N. NET METERING STUDY. THE COMMISSION SHALL CONDUCT A STUDY TO 4 ANALYZE THE ECONOMIC AND ENVIRONMENTAL BENEFITS FROM AND THE ECONOMIC 5 COST BURDEN, IF ANY, OF THE NET ENERGY METERING PROGRAM AND TO ANALYZE 6 THE EXTENT TO WHICH RATEPAYERS RECEIVING SERVICE UNDER THE NET ENERGY 7 METERING PROGRAM ARE PAYING THE FULL COST OF SERVICES PROVIDED TO THEM 8 BY COMBINED ELECTRIC AND GAS CORPORATIONS AND GAS CORPORATIONS, AND THE 9 EXTENT TO WHICH THEIR CUSTOMERS PAY A SHARE OF COSTS OF PUBLIC PURPOSE 10 PROGRAMS THROUGH ASSESSMENTS ON THEIR ELECTRIC AND/OR GAS BILLS. IN 11 ANALYZING PROGRAM COSTS AND BENEFITS FOR THE PURPOSES OF THIS STUDY, THE 12 COMMISSION SHALL CONSIDER ALL ELECTRICITY GENERATED BY RENEWABLE ELEC- 13 TRIC GENERATING SYSTEMS ELIGIBLE FOR NET METERING UNDER SECTIONS SIXTY- 14 SIX-J AND SIXTY-SIX-L OF THIS ARTICLE, INCLUDING THE ELECTRICITY USED 15 ONSITE TO REDUCE THE CUSTOMER'S CONSUMPTION OF ELECTRICITY THAT WOULD 16 OTHERWISE BE SUPPLIED THROUGH THE ELECTRICAL GRID, AS WELL AS ELECTRICAL 17 OUTPUT THAT IS BEING FED BACK TO THE ELECTRICAL GRID FOR WHICH THE 18 CUSTOMER RECEIVES CREDIT OR NET SURPLUS ELECTRICITY COMPENSATION UNDER EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets [ ] is old law to be omitted. LBD10909-02-4 S. 5149--A 2 1 NET ENERGY METERING. AS IT RELATES TO THE ENVIRONMENTAL BENEFITS, THE 2 STUDY SHALL QUANTIFY THE APPROXIMATE AVOIDED LEVEL OF HARMFUL EMISSIONS 3 INCLUDING, BUT NOT LIMITED TO, INFORMATION CONCERNING: NITROGEN DIOXIDE, 4 SULFUR DIOXIDE AND CARBON DIOXIDE, AS WELL AS OTHER AIR POLLUTANTS 5 DEEMED NECESSARY AND APPROPRIATE FOR STUDY BY THE COMMISSION. THE STUDY 6 SHALL ALSO QUANTIFY THE ECONOMIC COSTS AND BENEFITS OF NET ENERGY METER- 7 ING TO PARTICIPANTS AND NON-PARTICIPANTS AND SHALL FURTHER DISAGGREGATE 8 THE RESULTS BY UTILITY. THE STUDY SHALL ALSO GATHER AND PRESENT DATA ON 9 THE INCOME DISTRIBUTION OF RESIDENTIAL NET METERING PARTICIPANTS THAT IS 10 PUBLICLY AVAILABLE AND AGGREGATED BY ZIP CODE AND COUNTY. IN ORDER TO 11 ASSESS THE ECONOMIC COSTS AND BENEFITS AT VARIOUS LEVELS OF NET METERING 12 IMPLEMENTATION, THE STUDY SHALL BE CONDUCTED USING MULTIPLE NET ENERGY 13 METERING PENETRATION SCENARIOS. 14 THE COMMISSION SHALL PUBLISH A REPORT FROM ITS FINDINGS. THE REPORT 15 MUST BE PUBLISHED WITHIN THREE HUNDRED SIXTY-FIVE DAYS OF THE EFFECTIVE 16 DATE OF THIS SECTION. A COPY OF THE REPORT MUST BE FURNISHED TO THE 17 TEMPORARY PRESIDENT OF THE SENATE, THE SPEAKER OF THE ASSEMBLY, THE 18 CHAIR OF THE SENATE ENERGY AND TELECOMMUNICATIONS COMMITTEE AND THE 19 CHAIR OF THE ASSEMBLY ENERGY COMMITTEE. 20 S 2. This act shall take effect immediately.