Bill Text: NY S01450 | 2019-2020 | General Assembly | Introduced


Bill Title: Prohibits the commissioner of general services from leasing or granting certain property rights to any entity to lay electric transmission lines when such lines transmit energy over an electric transmission line that interconnects a location outside of the United States when the transmission does not provide access to electric generating facilities within the state.

Spectrum: Partisan Bill (Republican 3-0)

Status: (Introduced - Dead) 2020-01-08 - REFERRED TO INVESTIGATIONS AND GOVERNMENT OPERATIONS [S01450 Detail]

Download: New_York-2019-S01450-Introduced.html


                STATE OF NEW YORK
        ________________________________________________________________________
                                          1450
                               2019-2020 Regular Sessions
                    IN SENATE
                                    January 14, 2019
                                       ___________
        Introduced  by  Sens.  O'MARA,  AMEDORE,  ORTT -- read twice and ordered
          printed, and when printed to be committed to the Committee on Investi-
          gations and Government Operations
        AN ACT to amend the public lands law, in relation to  the  authority  to
          grant property rights
          The  People of the State of New York, represented in Senate and Assem-
        bly, do enact as follows:
     1    Section 1. Section 3 of the public lands law is amended  by  adding  a
     2  new subdivision 8 to read as follows:
     3    8.  (a)  Notwithstanding  any  law, rule, regulation, policy, order or
     4  executive action to the contrary, the commissioner of  general  services
     5  shall  not lease, or grant rights or easements to, the bed of Lake Cham-
     6  plain and to the bed of the Hudson River  to  any  individual,  trustee,
     7  partnership,  association, corporation, company, municipality, political
     8  subdivision or other legal entity for laying  an  electric  transmission
     9  line,  including  but not limited to a high voltage direct current elec-
    10  tric transmission line,  that  enters  commercial  operation  after  the
    11  effective  date of this subdivision, if such transmission line intercon-
    12  nects a location outside the territorial limits of the United States  to
    13  a  location  within  the  state and such transmission line: (i) is not a
    14  merchant transmission line; or (ii) does not provide access  within  the
    15  upstate  region  to  electric  generating  facilities located within the
    16  upstate region to transmit energy to a  location  within  the  downstate
    17  region.
    18    (b)  For  the  purposes  of this subdivision, a "merchant transmission
    19  line" shall mean an electric transmission line and all  related  facili-
    20  ties, including but not limited to voltage source converter stations for
    21  a  high  voltage  direct current transmission line, that: (i) are devel-
    22  oped, financed, constructed, and operated without any reliance on  cost-
    23  of-service rates set by either a federal or state regulatory entity; and
    24  (ii)  are  not  included  in  the  utility rate base, either directly or
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD05809-01-9

        S. 1450                             2
     1  through a contractual arrangement between the developer  of  the  trans-
     2  mission line and any agency, authority or other entity of the state, any
     3  municipal  subdivision  of  the state, any utility subject to cost-based
     4  regulation, or any instrumentality of any of the foregoing.
     5    (c)  For the purposes of this subdivision, "upstate region" shall have
     6  the same meaning as in paragraph (b) of subdivision two of section 6-102
     7  of the energy law, and "downstate region" shall have the same meaning as
     8  in paragraph (a) of subdivision two of section 6-102 of the energy law.
     9    § 2. This act shall take effect immediately.
feedback