Bill Text: NY A07685 | 2017-2018 | General Assembly | Introduced
Bill Title: Prohibits the authority from contracting or purchasing energy or environmental attributes when such energy is transmitted over an electric transmission line that interconnects a location outside of the United States when the transmission does not provide access to electric generating facilities within the state.
Spectrum: Moderate Partisan Bill (Democrat 12-2)
Status: (Introduced - Dead) 2018-01-03 - referred to corporations, authorities and commissions [A07685 Detail]
Download: New_York-2017-A07685-Introduced.html
STATE OF NEW YORK ________________________________________________________________________ 7685 2017-2018 Regular Sessions IN ASSEMBLY May 9, 2017 ___________ Introduced by M. of A. PAULIN, WALKER, D'URSO, GUNTHER, GOTTFRIED, ORTIZ, MURRAY -- Multi-Sponsored by -- M. of A. COOK, SIMON, THIELE -- read once and referred to the Committee on Corporations, Authorities and Commissions AN ACT to amend the public authorities law, in relation to the authority to contract for energy The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. Section 1005 of the public authorities law is amended by 2 adding a new closing paragraph to read as follows: 3 Notwithstanding any law, rule, regulation, policy, order or executive 4 action to the contrary, the authority shall not contract for or other- 5 wise purchase or acquire power or energy, or associated environmental 6 attributes, from any individual, trustee, partnership, association, 7 corporation, company, municipality, political subdivision or other legal 8 entity if such energy is transmitted over an electric transmission line, 9 including but not limited to a high voltage direct current electric 10 transmission line, that enters commercial operation after the effective 11 date of this paragraph and that interconnects a location outside the 12 territorial limits of the United States to a location within the state 13 and such transmission line does not provide access within the state to 14 electric generating facilities located within the state to transmit such 15 power or energy to a location within the state. 16 § 2. This act shall take effect immediately. EXPLANATION--Matter in italics (underscored) is new; matter in brackets [] is old law to be omitted. LBD10437-01-7