NY A06609 | 2019-2020 | General Assembly
Status
Spectrum: Partisan Bill (Republican 9-0)
Status: Introduced on March 14 2019 - 25% progression, died in committee
Action: 2020-07-14 - held for consideration in energy
Pending: Assembly Energy Committee
Text: Latest bill text (Introduced) [HTML]
Status: Introduced on March 14 2019 - 25% progression, died in committee
Action: 2020-07-14 - held for consideration in energy
Pending: Assembly Energy Committee
Text: Latest bill text (Introduced) [HTML]
Summary
Establishes a procedure for the approval of increasing the transfer capability of existing electric transmission lines.
Title
Establishes a procedure for the approval of increasing the transfer capability of existing electric transmission lines.
Sponsors
Roll Calls
2020-07-14 - Assembly - Assembly Energy Committee: Held for Consideration (Y: 11 N: 4 NV: 0 Abs: 0) [PASS]
History
Date | Chamber | Action |
---|---|---|
2020-07-14 | Assembly | held for consideration in energy |
2020-01-08 | Assembly | referred to energy |
2019-03-14 | Assembly | referred to energy |