Bill Text: NH HB1472 | 2016 | Regular Session | Introduced


Bill Title: Relative to the siting of certain new pipelines and storage vessels.

Spectrum: Moderate Partisan Bill (Republican 7-1)

Status: (Introduced - Dead) 2016-03-09 - Inexpedient to Legislate: Motion Adopted Voice Vote 03/09/2016 House Journal 23 P. 64 [HB1472 Detail]

Download: New_Hampshire-2016-HB1472-Introduced.html

HB 1472 - AS INTRODUCED

 

2016 SESSION

16-2545

06/05

 

HOUSE BILL 1472

 

AN ACT relative to the siting of certain new pipelines and storage vessels.

 

SPONSORS: Rep. McConnell, Ches. 12; Rep. Emerson, Ches. 11; Rep. B. Tilton, Ches. 12; Rep. J. Belanger, Hills. 27; Rep. Abramson, Rock. 20; Rep. Edelblut, Hills. 38; Sen. Sanborn, Dist 9; Sen. Avard, Dist 12

 

COMMITTEE: Science, Technology and Energy

 

-----------------------------------------------------------------

 

ANALYSIS

 

This bill requires new construction of certain underground pipelines and storage tanks to be below the frost line.

 

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

 

Explanation: Matter added to current law appears in bold italics.

Matter removed from current law appears [in brackets and struckthrough.]

Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.

16-2545

06/05

 

STATE OF NEW HAMPSHIRE

 

In the Year of Our Lord Two Thousand Sixteen

 

AN ACT relative to the siting of certain new pipelines and storage vessels.

 

Be it Enacted by the Senate and House of Representatives in General Court convened:

 

1  New Section; New Construction of Underground Pipelines and Storage Tanks.  Amend RSA 162-H by inserting after section 10-b the following new section:

162-H:10-c  New Construction of Underground Pipelines and Storage Tanks.  After the effective date of this section, any certificate issued for underground construction of a pipeline or tank that is used for the commercial transmission, distribution, or storage of explosive, flammable, contaminate, or hazardous gasses or liquids shall require such construction to be below the frost line.

2  Effective Date.  This act shall take effect 60 days after its passage.