HOUSE BILL No. 1094
_____
DIGEST OF INTRODUCED BILL
Citations Affected: IC 36-1-12-3.
Synopsis: Public work projects. Provides that a political subdivision
may perform public work by using its own workforce if the cost of the
project is less than $150,000. (Current law provides that the project
cost must be less than $100,000.)
Effective: July 1, 2011.
January 5, 2011, read first time and referred to Committee on Local Government.
Introduced
First Regular Session 117th General Assembly (2011)
PRINTING CODE. Amendments: Whenever an existing statute (or a section of the Indiana
Constitution) is being amended, the text of the existing provision will appear in this style type,
additions will appear in
this style type, and deletions will appear in
this style type.
Additions: Whenever a new statutory provision is being enacted (or a new constitutional
provision adopted), the text of the new provision will appear in
this style type. Also, the
word
NEW will appear in that style type in the introductory clause of each SECTION that adds
a new provision to the Indiana Code or the Indiana Constitution.
Conflict reconciliation: Text in a statute in
this style type or
this style type reconciles conflicts
between statutes enacted by the 2010 Regular Session of the General Assembly.
HOUSE BILL No. 1094
A BILL FOR AN ACT to amend the Indiana Code concerning local
government.
Be it enacted by the General Assembly of the State of Indiana:
SOURCE: IC 36-1-12-3; (11)IN1094.1.1. -->
SECTION 1. IC 36-1-12-3 IS AMENDED TO READ AS
FOLLOWS [EFFECTIVE JULY 1, 2011]: Sec. 3. (a) The board may
purchase or lease materials in the manner provided in IC 5-22 and
perform any public work, by means of its own workforce, without
awarding a contract whenever the cost of that public work project is
estimated to be less than one hundred
fifty thousand dollars
($100,000). ($150,000). Before a board may perform any work under
this section by means of its own workforce, the political subdivision or
agency must have a group of employees on its staff who are capable of
performing the construction, maintenance, and repair applicable to that
work. For purposes of this subsection, the cost of a public work project
includes the actual cost of materials, labor, equipment, rental, a
reasonable rate for use of trucks and heavy equipment owned, and all
other expenses incidental to the performance of the project.
(b) When the project involves the rental of equipment with an
operator furnished by the owner, or the installation or application of
materials by the supplier of the materials, the project is considered to
be a public work project and subject to this chapter. However, an
annual contract may be awarded for equipment rental and materials to
be installed or applied during a calendar or fiscal year if the proposed
project or projects are described in the bid specifications.
(c) A board of aviation commissioners or an airport authority board
may purchase or lease materials in the manner provided in IC 5-22 and
perform any public work by means of its own workforce and owned or
leased equipment, in the construction, maintenance, and repair of any
airport roadway, runway, taxiway, or aircraft parking apron whenever
the cost of that public work project is estimated to be less than fifty
thousand dollars ($50,000).
(d) Municipal and county hospitals must comply with this chapter
for all contracts for public work that are financed in whole or in part
with cumulative building fund revenue, as provided in section 1(c) of
this chapter. However, if the cost of the public work is estimated to be
less than fifty thousand dollars ($50,000), as reflected in the board
minutes, the hospital board may have the public work done without
receiving bids, by purchasing the materials and performing the work by
means of its own workforce and owned or leased equipment.
(e) If a public works project involves a structure, an improvement,
or a facility under the control of a department (as defined in
IC 4-3-19-2(2)), the department may not artificially divide the project
to bring any part of the project under this section.