Bill Text: IL HB1616 | 2023-2024 | 103rd General Assembly | Engrossed
Bill Title: Amends the Environmental Protection Act. Requires permitting and construction to commence prior to July 1, 2027 (rather than 2025) before a pilot project allowing for a pyrolysis or gasification facility is permitted for a locally zoned and approved site in either Will County or Grundy County. Makes a conforming change to language regarding repealing the provisions. Effective immediately.
Spectrum: Bipartisan Bill
Status: (Introduced) 2023-03-27 - Rule 19(a) / Re-referred to Rules Committee [HB1616 Detail]
Download: Illinois-2023-HB1616-Engrossed.html
| |||||||
| |||||||
| |||||||
1 | AN ACT concerning safety.
| ||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||
3 | represented in the General Assembly:
| ||||||
4 | Section 5. The Environmental Protection Act is amended by | ||||||
5 | changing Section 22.60 as follows:
| ||||||
6 | (415 ILCS 5/22.60)
| ||||||
7 | (For Section repeal see subsection (e)) | ||||||
8 | Sec. 22.60. Pilot project for Will County and Grundy | ||||||
9 | County pyrolysis or gasification facility. | ||||||
10 | (a) As used in this Section: | ||||||
11 | "Plastics" means polystyrene or any other synthetic | ||||||
12 | organic polymer that can be molded into shape under heat and | ||||||
13 | pressure and then set into a rigid or slightly elastic form. | ||||||
14 | "Plastics gasification facility" means a manufacturing | ||||||
15 | facility that: | ||||||
16 | (1) receives only uncontaminated plastics that have | ||||||
17 | been processed prior to receipt at the facility into a | ||||||
18 | feedstock meeting the facility's specifications for a | ||||||
19 | gasification feedstock; and | ||||||
20 | (2) uses heat in an oxygen-deficient atmosphere to | ||||||
21 | process the feedstock into fuels, chemicals, or chemical | ||||||
22 | feedstocks that are returned to the economic mainstream in | ||||||
23 | the form of raw materials or products. |
| |||||||
| |||||||
1 | "Plastics pyrolysis facility" means a manufacturing | ||||||
2 | facility that: | ||||||
3 | (1) receives only uncontaminated plastics that have | ||||||
4 | been processed prior to receipt at the facility into a | ||||||
5 | feedstock meeting the facility's specifications for a | ||||||
6 | pyrolysis feedstock; and | ||||||
7 | (2) uses heat in the absence of oxygen to process the | ||||||
8 | uncontaminated plastics into fuels, chemicals, or chemical | ||||||
9 | feedstocks that are returned to the economic mainstream in | ||||||
10 | the form of raw materials or products. | ||||||
11 | (b) Provided that permitting and construction has | ||||||
12 | commenced prior to July 1, 2027 2025 , a pilot project allowing | ||||||
13 | for a pyrolysis or gasification facility in accordance with | ||||||
14 | this Section is permitted for a locally zoned and approved | ||||||
15 | site in either Will County or Grundy County. | ||||||
16 | (c) To the extent allowed by federal law, uncontaminated | ||||||
17 | plastics that have been processed into a feedstock meeting | ||||||
18 | feedstock specifications for a plastics gasification facility | ||||||
19 | or plastics pyrolysis facility, and that are further processed | ||||||
20 | by such a facility and returned to the economic mainstream in | ||||||
21 | the form of raw materials or products, are considered recycled | ||||||
22 | and are not subject to regulation as waste. | ||||||
23 | (d) The Agency may propose to the Board for adoption, and | ||||||
24 | the Board may adopt, rules establishing standards for | ||||||
25 | materials accepted as feedstocks by plastics gasification | ||||||
26 | facilities and plastics pyrolysis facilities, rules |
| |||||||
| |||||||
1 | establishing standards for the management of feedstocks at | ||||||
2 | plastics gasification facilities and plastics pyrolysis | ||||||
3 | facilities, and any other rules, as may be necessary to | ||||||
4 | implement and administer this Section. | ||||||
5 | (e) If permitting and construction for the pilot project | ||||||
6 | under subsection (b) has not commenced by July 1, 2027 2025 , | ||||||
7 | this Section is repealed.
| ||||||
8 | (Source: P.A. 101-141, eff. 7-1-20; 102-558, eff. 8-20-21.)
| ||||||
9 | Section 99. Effective date. This Act takes effect upon | ||||||
10 | becoming law.
|