Bill Text: IA SF312 | 2019-2020 | 88th General Assembly | Introduced


Bill Title: A bill for an act providing for the development of a strategic plan regarding renewable energy production in the state.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2019-02-21 - Subcommittee: Nunn, Lykam, and Miller-Meeks. S.J. 380. [SF312 Detail]

Download: Iowa-2019-SF312-Introduced.html
Senate File 312 - Introduced SENATE FILE 312 BY WAHLS A BILL FOR An Act providing for the development of a strategic plan 1 regarding renewable energy production in the state. 2 BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF IOWA: 3 TLSB 2057XS (1) 88 gh/rn
S.F. 312 Section 1. Section 15.120, Code 2019, is amended by adding 1 the following new subsection: 2 NEW SUBSECTION . 4A. The center shall develop a strategic 3 plan which provides a framework for achieving the production 4 of eighty percent of the state’s energy needs from renewable 5 energy sources by 2030, and one hundred percent by 2050. 6 The plan shall focus on the development of renewable energy 7 production in the state, including but not limited to renewable 8 fuel production, infrastructure improvements to facilitate 9 increased capacity and new technology, and increased energy 10 efficiency. The plan shall be included in the annual report 11 submitted to the general assembly and the legislative services 12 agency by January 15, 2020, as required under subsection 3, 13 paragraph “b” . 14 EXPLANATION 15 The inclusion of this explanation does not constitute agreement with 16 the explanation’s substance by the members of the general assembly. 17 This bill directs the Iowa energy center to develop a 18 strategic plan which provides a framework for achieving the 19 production of 80 percent of the state’s energy needs from 20 renewable energy sources by 2030, and 100 percent by 2050. 21 The plan shall focus on the development of renewable energy 22 production in Iowa, including but not limited to renewable 23 fuel, infrastructure improvements to facilitate increased 24 capacity and new technology, and increased energy efficiency. 25 The plan shall be included in the annual report submitted to 26 the general assembly and legislative services agency by January 27 15, 2020. 28 -1- LSB 2057XS (1) 88 gh/rn 1/ 1
feedback