THE SENATE |
S.B. NO. |
671 |
TWENTY-SEVENTH LEGISLATURE, 2013 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of THE nineteenth SENATORIAL DISTRICT.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $98,225,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2013-2014 for the purpose of capital improvement projects for the nineteenth senatorial district, as follows:
1. James Campbell High School, Oahu
A. Design, construction, and equipment for air conditioning for entire school
Design $600,000
Construction $10,400,000
Equipment $1,000,000
Total funding $12,000,000
2. Ewa Elementary School, Oahu
A. Design and construction of playground equipment
Plans $10,000
Construction $50,000
Total funding $60,000
B. Plans, design, and construction for a parking lot
Plans $50,000
Design $50,000
Construction $1,000,000
Total funding $1,100,000
3. Ewa Beach Elementary School, Oahu
A. Renovation of buildings F and G
Design $755,000
Construction $3,430,000
Equipment $15,000
Total funding $4,200,000
B. Design, construction, and equipment for air conditioning in all classrooms
Design $220,000
Construction $3,280,000
Equipment $500,000
Total funding $4,000,000
4. Ilima Intermediate School, Oahu
A. Design, construction, and equipment for new administration building
Design $550,000
Construction $6,000,000
Equipment $50,000
Total funding $6,600,000
B. Design and construction to enlarge and expand school parking lots
Design $55,000
Construction $600,000
Total funding $655,000
C. Design, construction, and equipment for two portable classrooms
Design $50,000
Construction $600,000
Equipment $25,000
Total funding $675,000
D. Design and construction for electrical and technology network upgrades
Design $175,000
Construction $1,900,000
Total funding $2,075,000
5. Iroquois Point Elementary School, Oahu
A. Design and construction for a grass field with sprinkler system
Design $40,000
Construction $340,000
Total funding $380,000
6. Kaimiloa Elementary School, Oahu
A. Design, construction, and equipment for a classroom
Design $700,000
Construction $7,500,000
Equipment $50,000
Total funding $8,250,000
B. Design, construction, and equipment for air conditioning for the entire school
Design $470,000
Construction $4,959,000
Equipment $1,000
Total funding $5,430,000
7. Keoneula Elementary School, Oahu
A. Design, construction, and equipment for a classroom building
Design $700,000
Construction $9,500,000
Equipment $100,000
Total funding $10,300,000
8. Pohakea Elementary School, Oahu
A. Additional funding for air conditioning and electrical upgrade of school
Design $530,000
Construction $5,965,000
Equipment $5,000
Total funding $6,500,000
9. Fort Weaver Road, Oahu
A. Plans, design, and construction for drainage at the south end of Ewa Beach Road
Total funding $3,000,000
10. Fort Weaver Road, Oahu
A. Add a third lane on Fort Weaver Road from the cross section of Geiger Road to Keoneula Parkway going both ways
Total funding $33,000,000
SECTION 2. The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2016, shall lapse as of that date.
SECTION 3. The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended by the appropriate expending agency for the purposes of this Act.
SECTION 4. This Act shall take effect on July 1, 2013.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
CIP; 19th Senatorial District
Description:
Appropriates funds for capital improvement projects in the 19th senatorial district.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.