Bill Text: HI SB2689 | 2022 | Regular Session | Introduced


Bill Title: Relating To Capital Improvement Projects For The Benefit Of The Sixteenth Senatorial District.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2022-01-24 - Referred to WAM. [SB2689 Detail]

Download: Hawaii-2022-SB2689-Introduced.html

THE SENATE

S.B. NO.

2689

THIRTY-FIRST LEGISLATURE, 2022

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE sixteenth SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $63,080,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2022-2023 for the purpose of capital improvement projects for the sixteenth senatorial district, as follows:

1.   Aiea Elementary School

     A.   Campus-wide covered walkways, parking lot solar canopy, and ground and site improvements.

          Design                          $40,000

          Construction                  $1,570,00

          Equipment                      $300,000

          Total funding                               $1,910,000

2.   Aiea High School

     A.   New culinary facility.

          Design                         $250,000

          Construction                 $3,150,000

          Equipment                      $600,000

          Total funding                               $5,000,000

     B.   ADA compliance upgrades for parking lot near flagpole.

          Plans                           $50,000

          Design                          $50,000

          Construction                   $900,000

          Equipment                       $50,000

          Total funding                               $1,050,000

3.   Alvah Scott Elementary School

     A.   New computer lab.

          Design                          $50,000

          Construction                   $200,000

          Equipment                      $150,000

          Total funding                                 $400,000

     B.   New kindergarten playground.

          Equipment                      $250,000

          Total funding                                 $250,000

     C.   Cafeteria kitchen upgrades.

          Equipment                      $500,000

          Total funding                                 $500,000

4.   Highlands Intermediate School

     A.   New water bottle refill stations.

          Construction                    $50,000

          Equipment                       $10,000

          Total funding                                  $60,000

     B.   Slope stabilization project, including retaining walls, terrace, backfill and concrete.

          Plans                          $100,000

          Design                         $100,000

          Construction                 $2,000,000

          Equipment                      $100,000

          Total funding                               $2,300,000

5.   Lehua Elementary School

     A.   Construction of new administration building and library.

          Construction                 $8,000,000

          Equipment                      $800,000

          Total funding                               $8,800,000

     B.   New covered playcourt.

          Plans                           $50,000

          Construction                 $5,000,000

          Equipment                      $250,000

          Total funding                               $5,300,000

6.   Momilani Elementary School

     A.   Design and conception of expansion of administration building.

          Plans                          $250,000

          Design                         $250,000

          Total funding                                 $500,000

     B.   Slope stabilization and covered playcourt.

          Plans                          $350,000

          Design                         $350,000

          Construction                 $7,000,000

          Equipment                      $250,000

          Total funding                               $7,950,000

7.   Pearl City High School

     A.   Replacement of auditorium dimmer system.

          Plans                          $250,000

          Design                         $250,000

          Construction                 $1,000,000

          Equipment                    $4,000,000

          Total funding                               $5,500,000

     B.   Refinish audience floors in auditorium.

          Plans                           $50,000

          Design                          $50,000

          Construction                   $100,000

          Total funding                                 $200,000

     C.   Resurface tennis courts and replace appurtenances.

          Plans                           $25,000

          Design                          $25,000

          Construction                   $500,000

          Total funding                                 $550,000

     D.   F-Building renovation for two classrooms, multipurpose room, and courtyard.

          Plans                          $250,000

          Design                         $250,000

          Construction                 $5,000,000

          Equipment                      $100,000

          Total funding                               $5,600,000

     E.   Electrical upgrades to install split system air-conditioning at Pearl City Cultural Center.

          Plans                           $25,000

          Design                          $25,000

          Construction                   $500,000

          Construction                   $100,000

          Total funding                                 $650,000

8.   Pearl City Highlands Elementary School

     A.   Construction and replacement of administration building and library.

          Plans                           $25,000

          Design                          $25,000

          Construction                 $7,000,000

          Equipment                      $250,000

          Total funding                               $7,300,000

9.   Pearl Ridge Elementary School

     A.   New playground area.

          Design                          $30,000

          Construction                    $50,000

          Equipment                      $100,000

          Total funding                                 $180,000

     B.   New eight-classroom building, ground and site improvements, and appurtenances.

          Design                         $325,000

          Construction                  $2,155,00

          Total funding                               $2,480,000

10.  Waiau Elementary School

     A.   Covered walkways from portables to cafeteria.

          Plans                           $50,000

          Design                          $50,000

          Construction                 $1,000,000

          Total funding                               $1,100,000

11.  Waimalu Elementary School

     A.   Drainage improvements and flooring for building f and library.

          Design                         $400,000

          Construction                  $1,600,00

          Total funding                               $2,000,000

     B.   Covered playcourt.

          Design                         $500,000

          Construction                 $3,000,000

          Total funding                               $3,500,000

     SECTION 2.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2024, shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended by the department of education for the purposes of this Act.

     SECTION 4.  This Act shall take effect on July 1, 2022.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 16th Senatorial District; Appropriation

 

Description:

Appropriates funds for capital improvement projects in the 16th senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback