The legislature further finds that some of the largest obstacles for developers to construct more housing in the State are:
(1) A lack of areas with proper zoning for residential dwellings to be constructed;
(2) A lack of infrastructure to support newly developed residential dwellings; and
(3) Delays in the issuance of building permits for single-family and multi-family projects.
The building permit processing times for single-family and multi-family projects vary tremendously across the United States. However, the counties in Hawaii seem to have some of the longest processing times for residential building permits. A study prepared by the university of Hawaii economic research office in April of 2022 found that, on average, Hawaii homebuilders wait three times longer for permits than those in other states, which drives up costs significantly and creates uncertainty, serving as a disincentive to build new projects. Furthermore, the study found that, compared to the most regulated markets in the country, Hawaii's permit delays are almost two times longer, meaning it can take between a year and a year and a half for a permit to be approved.
The lengthy processing times to obtain a building permit begs the question: what information is necessary for counties when processing building permit applications? The basic responsibilities of the county are to ensure compliance with various building codes and ensure adequate infrastructure capacity to support the proposed project or development. Although the counties are responsible to check for compliance with various building codes, if the construction plans do not satisfy the code and are not corrected prior to construction, the designer (a licensed professional who stamped the plans) and the contractor are ultimately responsible. The county is also not typically involved in litigation as the building permit process is ministerial, mainly to check for code compliance.
In other municipalities around the country, building plans are not scrutinized to the extent that they are in Hawaii counties. In Hawaii, the plan review is to ensure that the design meets all applicable codes. However, in other municipalities, the plans are used as a guide and code compliance is done during the inspection of the project during construction. Inspectors who find construction does not satisfy the code either have the correction done in the field or stop construction until proper corrective actions have been taken to ensure the new construction meets the code. Ultimately, the design professional and contractor are responsible to ensure the new construction meets all applicable codes.
Accordingly, the purpose of this Act is to establish a permit process that shifts the responsibility for code compliance from the counties to the design professional for all single-family and multi-family residential projects.
SECTION 2. Chapter 46, Hawaii Revised Statutes, is amended by adding a new section to be appropriately designated and to read as follows:
"§46- Building permit applications; certification;
review time limit. For single-family and multi-family projects in each county, a building
permit shall be issued within sixty days of an application being filed that is
stamped by a duly licensed structural, civil, electrical, or mechanical
engineer and architect certifying that all plans and specifications are in
compliance with the applicable building codes for the respective county. The certification shall include a statement
that adequate infrastructure capacity is available to service the project
site. During the sixty-day period after
the building permit application has been submitted, the respective county shall
ensure that the project is in compliance with applicable ordinances regarding
land use, set-back, height, and site development requirements for the project
site; provided that non-compliance with any of the county's discretionary
approvals may delay the county's issuance of the building permit."
SECTION 3. New statutory material is underscored.
SECTION 4. This Act shall take effect upon its approval.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
Housing; Counties; Building Permits; Review Time Limits; Code Compliance
Description:
Requires counties to grant building permits within sixty days if the application is stamped and certified by a licensed engineer and architect.