HOUSE OF REPRESENTATIVES

H.B. NO.

2666

TWENTY-EIGHTH LEGISLATURE, 2016

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE FOURTEENTH, FIFTEENTH, AND SIXTEENTH REPRESENTATIVE DISTRICTS.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2016-2017:

     1.   To be expended by the department of education:

     A.   Hanalei elementary school, Kauai

          Plans, design, construction, and equipment for technical infrastructure upgrades; installation of CAT6 copper cables; replacement of fiber backbone between buildings; and installation of new IDFs, as necessary.

          Plans                                    $50,000

          Design                                   $50,000

          Construction                            $150,000

          Equipment                                $50,000

          Total funding                           $300,000

     B.   Kapaa elementary school, Kauai

          Plans, design, construction, and equipment for technical infrastructure upgrades; installation of CAT6 copper cables; replacement of fiber backbone between buildings; and installation of new IDFs, as necessary.

          Plans                                    $50,000

          Design                                   $50,000

          Construction                            $550,000

          Equipment                                $50,000

          Total funding                           $700,000

     C.   Kapaa middle school, Kauai

          Design and construction to replace classroom windows to increase air ventilation and to provide increased safety as a disaster relief shelter.

          Design                                   $10,000

          Construction                          $1,790,000

          Total funding                         $1,800,000

     D.   Kapaa high school, Kauai

          Plans, design, construction, and equipment for technical infrastructure upgrades; installation of CAT6 copper cables; replacement of fiber backbone between buildings; and installation of new IDFs, as necessary.

          Plans                                    $50,000

          Design                                   $50,000

          Construction                            $850,000

          Equipment                                $50,000

          Total funding                         $1,000,000

     E.   Kaumualii elementary school, Kauai

          Plans, design, construction, and equipment for technical infrastructure upgrades; installation of CAT6 copper cables; replacement of fiber backbone between buildings; and installation of new IDFs, as necessary.

          Plans                                    $50,000

          Design                                   $50,000

          Construction                            $550,000

          Equipment                                $50,000

          Total funding                           $700,000

     F.   Kekaha elementary school, Kauai

          Plans, design, construction, and equipment for technical infrastructure upgrades; installation of CAT6 copper cables; replacement of fiber backbone between buildings; and installation of new IDFs, as necessary.

          Plans                                    $50,000

          Design                                   $50,000

          Construction                            $375,000

          Equipment                                $50,000

          Total funding                           $525,000

     G.   Kilauea elementary school, Kauai

          Plans, design, construction, and equipment for technical infrastructure upgrades; installation of CAT6 copper cables; replacement of fiber backbone between buildings; and installation of new IDFs, as necessary.

          Plans                                    $50,000

          Design                                   $50,000

          Construction                            $300,000

          Equipment                                $50,000

          Total funding                           $450,000

     H.   Waimea high school, Kauai

          Plans, design, construction, and equipment for technical infrastructure upgrades; installation of CAT6 copper cables; replacement of fiber backbone between buildings; and installation of new IDFs, as necessary.

          Plans                                    $50,000

          Design                                   $50,000

          Construction                            $800,000

          Equipment                                $50,000

          Total funding                           $950,000

     I.   Waimea canyon middle school, Kauai

          Plans, design, construction, and equipment for technical infrastructure upgrades; installation of CAT6 copper cables; replacement of fiber backbone between buildings; and installation of new IDFs, as necessary.

          Plans                                    $50,000

          Design                                   $50,000

          Construction                            $425,000

          Equipment                                $50,000

          Total funding                           $575,000

     J.   Waimea canyon middle school, Kauai

          Design and construction for installation of an outdoor covered play-court.

          Design                                  $200,000

          Construction                          $1,190,000

          Total funding                         $1,390,000

     K.   Wilcox elementary school, Kauai

          Construction to repair and improve the rubberized padding of the playground floor and playground equipment.

          Construction                            $200,000

          Total funding                           $200,000

     2.   To be expended by the department of land and natural resources:

     A.   Waiakaea (Lihi) canal boat ramp and parking lot improvements and Waiakaea canal drainage project, Kauai

          Plans, design, construction, and equipment for reconstruction and renovation of trailer and vehicle parking lot, boat wash down area, and pavilion; dredging of canal; and removal and replacement of navigation aids.

          Plans                                   $250,000

          Design                                  $250,000

          Construction                          $2,250,000

          Equipment                               $250,000

          Total funding                         $3,000,000

     B.   Clearing of Waioli Stream, Kauai

          Construction and equipment for removal of overgrowth of hau and buffalo grass in a proper manner to prevent water pollution and future loss of farm land and assets.

          Construction                            $375,000

          Equipment                               $375,000

          Total funding                           $750,000

C.   Open galvanized flume; Waioli valley, Kauai

Construction to replace the damaged flume with a new full round aluminum culvert to restore proper water flow to farms.

          Construction                             $10,000

          Total funding                            $10,000

     D.   Waimea river mouth clearing, Kauai

          Construction to provide one-time removal of the sand bar at the mouth of the stream.

          Construction                          $1,500,000

          Total funding                         $1,500,000

     E.   Peekauai ditch maintenance, Kauai

          Construction to clear a 600 foot section of Peekauai (Menehune) ditch to remove sediment and debris.

          Construction                            $200,000

          Total funding                           $200,000

     3.   To be expended by the county of Kauai:

     A.   Salt pond master plan, Kauai

          Plans and design to develop a master plan to preserve and protect the salt pond area and provide cohesion for improvements.

          Plans                                   $200,000

          Design                                  $200,000

          Total funding                           $400,000

     B.   Veterans cemetery, Kauai

          Construction of repairs and upgrades to cemetery facilities to meet the current building code requirements and standards.

          Construction                            $700,000

          Total funding                           $700,000

     C.   Water storage infrastructure, Kauai

          Construction of two 0.5 million gallon storage tanks to provide adequate water flow storage capacity for fire suppression for Kapaa High School, Kapaa Middle School and the Samuel Mahelona Memorial Hospital.

          Construction                          $8,000,000

          Total funding                         $8,000,000

     D.   Kapaa Homesteads well No. 4, Kauai

          Construction to develop Kapaa Homesteads well No. 4 as a primary source of water.

          Construction                            $750,000

          Total funding                           $750,000

     E.   Water storage infrastructure, Kauai

          Construction of a 9,000 foot, 18-inch water main transmission line to increase water flow capacity for fire suppression for Elsie H. Wilcox elementary school, Wilcox Memorial Hospital, and businesses and residents in the area.

          Construction                          $3,000,000

          Total funding                         $3,000,000

     F.   Water storage infrastructure, Kauai

          Plans and construction of a new 0.2 million gallon storage tank to provide adequate water flow storage capacity for fire suppression for Haena State Park, businesses and residents.

          Plans                                   $100,000

          Construction                            $400,000

          Total funding                           $500,000

     SECTION 2.  The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended by the designated expending agency for the purpose of this Act.

     Section 3. This Act shall take effect on July 1, 2016.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 14th, 15th, and 16th Representative Districts

 

Description:

Appropriates funds for capital improvement projects in the 14th, 15th, and 16th representative districts.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.