Amended  IN  Senate  May 26, 2017
Amended  IN  Senate  April 20, 2017
Amended  IN  Senate  April 17, 2017
Amended  IN  Senate  February 14, 2017
Amended  IN  Senate  February 02, 2017

CALIFORNIA LEGISLATURE— 2017–2018 REGULAR SESSION

Senate Bill No. 57


Introduced by Senators Stern and Hertzberg
(Coauthors: Senators Allen, Wiener, and Wilk)
(Coauthors: Assembly Members Acosta and Dababneh)

December 08, 2016


An act to amend Section 3217 of the Public Resources Code, and to amend Section 714 of the Public Utilities Code, relating to natural gas, and declaring the urgency thereof, to take effect immediately.


LEGISLATIVE COUNSEL'S DIGEST


SB 57, as amended, Stern. Natural gas storage: moratorium.
(1) Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law requires the State Oil and Gas Supervisor to continue the prohibition against Southern California Gas Company injecting any natural gas into the Aliso Canyon natural gas storage facility located in the County of Los Angeles until a comprehensive review of the safety of the gas storage wells at the facility is completed, as specified, the supervisor determines that well integrity has been ensured by the review, the risks of failures identified in the review have been addressed, the supervisor’s duty to prevent damage to life, health, property, and natural resources, and other requirements is satisfied, and the Executive Director of the Public Utilities Commission has concurred via letter with the supervisor regarding his or her determination of safety.
This bill would additionally require the supervisor to continue that prohibition until a specified root cause analysis of the natural gas leak from the facility that started approximately October 23, 2015, has been completed and released in its entirety to the public. The bill would, notwithstanding that prohibition, authorize the Governor to order incremental injections at the facility, but only if the Governor determines it is necessary to avoid, or respond to, an emergency situation.
(2) Under existing law, the Public Utilities Commission is authorized to supervise and regulate every public utility in the state. Existing law requires the commission, no later than July 1, 2017, to open a proceeding to determine the feasibility of minimizing or eliminating use of the Aliso Canyon natural gas storage facility located in the County of Los Angeles while still maintaining energy and electric reliability for the region, and to consult with specified entities in making its determination.
This bill would require the commission, in conducting the proceeding, to act in the manner that will maximize transparency.
(3) This bill would declare that it is to take effect immediately as an urgency statute.
Vote: 2/3   Appropriation: NO   Fiscal Committee: YES   Local Program: NO  

The people of the State of California do enact as follows:


SECTION 1.

 (a) The Legislature finds and declares all of the following:
(1) Chapter 14 of the Statutes of 2016 was enacted to address the significant natural gas leak at the Aliso Canyon natural gas storage facility located in the County of Los Angeles that started on approximately October 23, 2015, and was not sealed until February 18, 2016.
(2) In order to protect public health and safety, Section 3217 of the Public Resources Code requires the State Oil and Gas Supervisor to continue the prohibition against the injection of natural gas into the Aliso Canyon natural gas storage facility until certain conditions are satisfied, as specified.
(3) The requirements of Section 3217 of the Public Resources Code do not affect or impair the authority of the Governor, as vested by the California Constitution and statutes, to declare an emergency based on a sudden and severe energy shortage under the California Emergency Services Act (Chapter 7 (commencing with Section 8550) of Division 1 of Title 2 of the Government Code).
(b) It is the intent of the Legislature to ensure the safety and reliability of the state’s electric and gas infrastructure and to ensure just and reasonable rates. The Governor may order incremental injections at the Aliso Canyon natural gas storage facility only to avoid, or respond to, an emergency situation.

SEC. 2.

 Section 3217 of the Public Resources Code is amended to read:

3217.
 (a) (1) The supervisor shall continue the prohibition against Southern California Gas Company injecting any natural gas into the Aliso Canyon natural gas storage facility located in the County of Los Angeles until a comprehensive review of the safety of the gas storage wells at the facility is completed and the supervisor determines that well integrity has been ensured by the review, the risks of failures identified in the review have been addressed, the third-party root cause analysis, instigated at the direction of the Safety and Enforcement Division of the Public Utilities Commission and the supervisor, of the natural gas leak from the facility that started approximately October 23, 2015, has been completed and released in its entirety to the public, and the supervisor’s duty to prevent damage to life, health, property, and natural resources, and to comply with other requirements, as specified in Section 3106, is satisfied. The supervisor may not lift the prohibition on injection until the Executive Director of the Public Utilities Commission has concurred via letter with the supervisor regarding his or her determination of safety.
(2) For purposes of this section, “facility” means the Aliso Canyon natural gas storage facility located in the County of Los Angeles operated by Southern California Gas Company.
(b) (1) The criteria for the gas storage well comprehensive safety review shall be determined by the supervisor with input from contracted independent experts and shall include the steps in subdivision (c).
(2) The supervisor shall direct the contracted independent experts to provide a methodology to be used in assessing the tests and inspections specified in the criteria. This requirement may be satisfied by the independent experts reviewing and, if necessary, revising the division’s written methodology for assessing the tests and inspections specified in the criteria. The methodology shall include all tests and inspections required by the criteria. The division shall post the methodology online on a public portion of its Internet Web site.
(c) The gas storage well comprehensive safety review shall include the following steps to ensure external and internal well mechanical integrity:
(1) All gas storage wells shall be tested and inspected from the surface to the packer or to any wellbore restriction near the top of the geologic formation being used for gas storage, whichever is higher in elevation, to detect existing leaks using temperature and noise logs.
(2) Any leaks shall be stopped and remediated to the satisfaction of the supervisor.
(3) Following remediation, leak detection tests shall be repeated and results reviewed by the supervisor.
(4) (A) Unless a well has been fully plugged and abandoned to the supervisor’s satisfaction and in accordance with Section 3208, the well shall be evaluated and remediated in accordance with subparagraph (B) or plugged in accordance with subparagraph (C).
(B) If a gas storage well is intended to return to service for the purposes of resuming injections to the facility, it shall be tested and inspected from the surface to the packer or to any wellbore restriction near the top of the geologic formation being used for gas storage, whichever is higher in elevation, to ensure mechanical integrity. As identified in the division’s criteria, these tests and inspections shall include the measurement of casing thickness and integrity, an evaluation of the cement bond on the casing, the determination as to whether any deformities in the well casing exist, and an evaluation of the well’s ability to withstand pressures that exceed maximum allowable injection and production pressures, with a reasonable margin for safety, at the facility in accordance with the criteria determined by the supervisor with input from independent experts pursuant to subdivision (b). If the tests reveal that a well poses a risk of failure, the supervisor shall require remediation and repeat tests as necessary to demonstrate to the satisfaction of the supervisor that remediation has mitigated any potential identified risks. If the operator cannot remediate the well to mitigate the identified risks to the satisfaction of the supervisor, the well shall be plugged and abandoned in accordance with Section 3208.
(C) (i) If a well is to be taken out of service before resumption of gas injections at the facility, it shall be removed from operation and isolated from the gas storage reservoir through plugging according to the division’s criteria, including, but not limited to, the demonstration of sufficient cement to prevent migrations between the reservoir and other zones, placement of a mechanical plug at the bottom of the well, and subsequent filling of the well with fluid, and to specifications approved by the supervisor. All gas storage wells that are taken out of service under this subparagraph shall be subjected to ongoing testing and monitoring requirements identified in the criteria determined by the supervisor with input from independent experts. The monitoring shall include, but not be limited to, real-time and daily pressure monitoring, as applicable. A gas storage well shall not be returned to service unless the testing and remediation required under subparagraph (B) has been completed.
(ii) A gas storage well, within one year of being plugged and isolated from the gas storage reservoir pursuant to clause (i), shall either be returned to service by satisfactorily completing the testing and remediation required under subparagraph (B) or be permanently plugged and abandoned to the supervisor’s satisfaction in accordance with Section 3208.
(D) The supervisor shall make a written finding for each gas storage well that has satisfactorily completed the testing and remediation required under subparagraph (B).
(5) The gas storage well comprehensive safety review is not complete until every gas storage well at the facility has completed the testing and remediation required under subparagraph (B) of paragraph (4), been temporarily abandoned and isolated from the reservoir as required under clause (i) of subparagraph (C) of paragraph (4), or been fully plugged and abandoned to the supervisor’s satisfaction in accordance with Section 3208.
(d) Upon completion of the gas storage well comprehensive safety review but before authorizing the commencement of injections at the facility, the division shall hold at least one duly noticed public meeting in the affected community to provide the public an opportunity to comment on the safety review findings and on the proposed pressure limit as provided in subdivision (e).
(e) (1) Before commencing injections at the facility, the operator of the facility shall provide the division with the proposed maximum reservoir pressure and include data and calculations supporting the basis for the pressure limit. The pressure limit shall account for the pressure required to inject intended gas volumes at all proposed inventory levels and the pressure limit shall not exceed the design pressure limits of the reservoir, wells, wellheads, piping, or associated facilities with an appropriate margin for safety.
(2) The operator’s proposed maximum reservoir pressure shall be subject to review and approval by the supervisor, and the supervisor shall consult with independent experts regarding the appropriate maximum and minimum reservoir pressure at the facility.
(f) Once the gas storage well comprehensive safety review is complete pursuant to paragraph (5) of subdivision (c), the supervisor has approved the maximum and minimum reservoir pressure pursuant to paragraph (2) of subdivision (e), and the public hearing is held pursuant to subdivision (d), the supervisor may allow injections of natural gas at the facility.
(g) All gas storage wells returning to service pursuant to subdivision (f) shall only inject or produce gas through the interior metal tubing and not through the annulus between the tubing and the well casing. The operator shall also conduct ongoing pressure monitoring and comply with any other requirements specified by the supervisor.
(h) The gas storage wells at the facility that are plugged and abandoned in accordance with Section 3208 pursuant to this section shall be periodically inspected by the operator for leaks using effective gas leak detection techniques such as optical gas imaging.
(i) (1) Before the completion of the gas storage well comprehensive safety review, production of natural gas from gas storage wells at the facility shall be limited to gas storage wells that have satisfactorily completed the testing and remediation required under subparagraph (B) of paragraph (4) of subdivision (c) unless insufficient production capacity is available. Only if production capacity supplied by the tested and remediated wells is demonstrably insufficient may the supervisor allow other gas storage wells to be used.
(2) The supervisor shall direct the operator of the facility to provide a plan to ensure, at the earliest possible time, the availability of sufficient gas production capacity using gas storage wells that have satisfactorily completed the testing and remediation required under subparagraph (B) of paragraph (4) of subdivision (c).
(j) With respect to the gas storage well comprehensive safety review at the facility, all testing, inspection and monitoring results reported to the division, gas storage well compliance status, any required remediation steps, and other safety review-related materials shall be posted in a timely manner by the division online on a public portion of its Internet Web site.
(k) Notwithstanding subdivisions (a) and (f), the Governor may order incremental injections at the facility, but only if the Governor determines it is necessary to avoid, or respond to, an emergency situation.

(k)

(l) This section shall remain in effect only until January 1, 2021, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2021, deletes or extends that date.

SEC. 3.

 Section 714 of the Public Utilities Code is amended to read:

714.
 (a) The commission, no later than July 1, 2017, shall open a proceeding to determine the feasibility of minimizing or eliminating use of the Aliso Canyon natural gas storage facility located in the County of Los Angeles while still maintaining energy and electric reliability for the region. This determination shall be consistent with the Clean Energy and Pollution Reduction Act of 2015 (Ch. 547, Stats. 2015) and Executive Order B-30-2015. The commission shall consult with the State Energy Resources Conservation and Development Commission, the Independent System Operator, the local publicly owned utilities that rely on natural gas for electricity generation, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, affected balancing authorities, and other relevant government entities, in making its determination.
(b) The commission, in conducting the proceeding, shall act in the manner that will maximize transparency.
(c) This section shall remain in effect only until January 1, 2021, and as of that date is repealed, unless a later enacted statute that is enacted before January 1, 2021, deletes or extends that date.

SEC. 4.

 This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to mitigate, at the earliest possible time, harm from the gas leak at the Aliso Canyon natural gas storage facility, and to thoroughly evaluate the integrity of and the risks associated with gas storage wells at that facility, it is necessary that this act take effect immediately.