CALIFORNIA LEGISLATURE— 2021–2022 REGULAR SESSION

Senate Bill
No. 1174


Introduced by Senator Hertzberg

February 17, 2022


An act to amend Sections 380, 399.13, 454.52, 454.53, and 913.4 of the Public Utilities Code, relating to electricity.


LEGISLATIVE COUNSEL'S DIGEST


SB 1174, as introduced, Hertzberg. Electricity: resource adequacy requirements: eligible renewable energy or energy storage resources: transmission and interconnection.
(1) Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator, to establish resource adequacy requirements for electrical corporations, electric service providers, and community choice aggregators to ensure the reliability of electrical service in California, while advancing the state’s goals for clean energy, reducing air pollution, and reducing emissions of greenhouse gases. Existing law requires the PUC to exercise its enforcement powers to ensure that electrical corporations, electric service providers, and community choice aggregators comply with the resource adequacy requirements.
This bill would require the PUC to waive any otherwise applicable penalty for noncompliance with the resource adequacy requirements if it finds that certain conditions have been met, including that the electrical corporation, electric service provider, or community choice aggregator has contracted for adequate resources to meet its resource adequacy requirements and that the contracted-for resources would otherwise be supplied, but for delays in the completion of a third-party transmission owner’s deliverability network upgrades, as specified.
(2) The Federal Energy Regulatory Commission (FERC) has exclusive jurisdiction over the transmission of electricity in interstate commerce, over the sale of electricity at wholesale in interstate commerce, and over all facilities for the transmission or sale of electricity in interstate commerce.
The California Renewables Portfolio Standard Program requires the PUC to establish a renewables portfolio standard requiring all retail sellers, including electrical corporations, electric service providers, and community choice aggregators, to procure a minimum quantity of electricity products from eligible renewable energy resources so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 44% by December 31, 2024, 52% by December 31, 2027, and 60% by December 31, 2030. Existing law requires an electrical corporation that owns electrical transmission facilities to annually prepare, as part of a specified FERC process, a report identifying any electrical transmission facility, upgrade, or enhancement that is reasonably necessary to achieve the procurement requirements of the California Renewables Portfolio Standard Program and to submit that report to the PUC.
This bill would require each electrical corporation that owns electrical transmission facilities to annually prepare, and submit to the PUC, a consolidated report on any delays to in-service dates of eligible renewable energy resources or energy storage resources and identify all prudent remedial actions to address and minimize those delays.
Existing law requires the PUC to annually report specified information to the Legislature in order to evaluate the progress of the state’s electrical corporations in complying with the California Renewables Portfolio Standard Program.
This bill would require that annual report to also include a systemwide assessment of delays to interconnection or transmission approvals for eligible renewable energy resources or energy storage resources, based on those annual consolidated reports.
(3) Existing law requires the PUC to adopt a process for each electrical corporation, electric service provider, or community choice aggregator to file an integrated resource plan and a schedule for periodic updates to the plan, and to ensure that those entities take specified actions, including meeting certain greenhouse gas emissions reduction targets and procuring at least 60% eligible renewable energy resources by December 31, 2030, as specified. For those purposes, existing law requires the PUC to consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources in helping to ensure those entities meet energy and reliability needs during peak demand, while reducing the need for new electricity generation resources and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
This bill would additionally require the PUC, for those purposes, to also consider the role of transmission, while deleting the requirement that such considerations reduce the need for new electricity generation resources and new transmission resources.
(4) Under existing law, it is the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045.
This bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission, State Air Resources Board, and Independent System Operator, to identify and advance all interconnection or transmission approvals necessary to address potential capacity shortfalls and achieve that policy, and would require those entities to execute an accelerated approval and completion process for those purposes.
(5) Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be a part of the act and a violation of a PUC action implementing its requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Vote: MAJORITY   Appropriation: NO   Fiscal Committee: YES   Local Program: YES  

The people of the State of California do enact as follows:


SECTION 1.

 Section 380 of the Public Utilities Code is amended to read:

380.
 (a) The commission, in consultation with the Independent System Operator, shall establish resource adequacy requirements for all load-serving entities.
(b) In establishing resource adequacy requirements, the commission shall ensure the reliability of electrical service in California while advancing, to the extent possible, the state’s goals for clean energy, reducing air pollution, and reducing emissions of greenhouse gases. The resource adequacy program shall achieve all of the following objectives:
(1) Facilitate development of new generating, nongenerating, and hybrid capacity and retention of existing generating, nongenerating, and hybrid capacity that is economic and needed.
(2) Establish new new, or maintain existing existing, demand response products and tariffs that facilitate the economic dispatch and use of demand response that can either meet or reduce an electrical corporation’s resource adequacy requirements, as determined by the commission.
(3) Equitably allocate the cost of generating capacity and demand response in a manner that prevents the shifting of costs between customer classes.
(4) Minimize enforcement requirements and costs.
(5) Maximize the ability of community choice aggregators to determine the generation resources used to serve their customers.
(c) Each load-serving entity shall maintain physical generating capacity and electrical demand response adequate to meet its load requirements, including, but not limited to, peak demand and planning and operating reserves. The generating capacity or electrical demand response shall be deliverable to locations and at times as may be necessary to maintain electrical service system reliability, local area reliability, and flexibility.
(d) Each load-serving entity shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the Board of Directors board of directors of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(e) (1) The commission shall implement and enforce the resource adequacy requirements established in accordance with this section in a nondiscriminatory manner. Each load-serving entity shall be subject to the same requirements for resource adequacy and the renewables portfolio standard program that are applicable to electrical corporations pursuant to this section, or otherwise required by law, or by order or decision of the commission. The commission shall exercise its enforcement powers to ensure compliance by all load-serving entities.
(2) The commission shall waive any otherwise applicable penalty for noncompliance with the resource adequacy requirements established pursuant to this section if it finds that all of the following conditions have been met:
(A) The load-serving entity has contracted for adequate resources to meet its resource adequacy requirements.
(B) Each entity contracted to supply the load-serving entity with those resources has, on or before the deadline specified in the supply agreement, completed construction of the associated generation and interconnection facilities that the entity is responsible for under its generator interconnection agreement.
(C) The load-serving entity and entity contracted to supply the load-serving entity with those resources have met all contractual and other requirements necessary to supply the contracted-for resources.
(D) (i) The contracted-for resources would otherwise be supplied and the load-serving entity would be in compliance with the resource adequacy requirements established pursuant to this section, but for delays in the completion of a third-party transmission owner’s deliverability network upgrades, as identified in the associated generator interconnection agreement.
(ii) With respect to a load-serving entity that owns relevant transmission facilities, in determining if the condition described in clause (i) has been met, the commission shall consider whether the load-serving entity has undertaken, in a timely fashion, reasonable measures under its control and consistent with its obligations under local, state, and federal laws and regulations to develop and construct new transmission facilities or perform upgrades to existing facilities necessary to enable generation resources to interconnect and provide contracted-for resources. In determining the reasonableness of a load-serving entity’s actions, the commission shall consider the load-serving entity’s expectations for full-cost recovery for these transmission facilities and upgrades.
(f) The commission shall require sufficient information, including, but not limited to, anticipated load, actual load, and measures undertaken by a load-serving entity to ensure resource adequacy, to be reported to enable the commission to determine compliance with the resource adequacy requirements established by the commission.
(g) An electrical corporation’s costs of meeting or reducing resource adequacy requirements, including, but not limited to, the costs associated with system reliability, local area reliability, and flexibility, that are determined to be reasonable by the commission, or are otherwise recoverable under a procurement plan approved by the commission pursuant to Section 454.5, shall be fully recoverable from those customers on whose behalf the costs are incurred, as determined by the commission, at the time the commitment to incur the cost is made, on a fully nonbypassable basis, as determined by the commission. The commission shall exclude any amounts authorized to be recovered pursuant to Section 366.2 when authorizing the amount of costs to be recovered from customers of a community choice aggregator or from customers that purchase electricity through a direct transaction pursuant to this subdivision.
(h) The commission shall determine and authorize the most efficient and equitable means for achieving all of the following:
(1) Meeting the objectives of this section.
(2) Ensuring that investment is made in new generating capacity.
(3) Ensuring that existing generating capacity that is economic is retained.
(4) Ensuring that the cost of generating capacity and demand response is allocated equitably.
(5) Ensuring that community choice aggregators can determine the generation resources used to serve their customers.
(6) Ensuring that investments are made in new and existing demand response resources that are cost effective and help to achieve electrical grid reliability and the state’s goals for reducing emissions of greenhouse gases.
(7) Minimizing the need for backstop procurement by the Independent System Operator.
(i) In making the determination pursuant to subdivision (h), the commission may consider a centralized resource adequacy mechanism among other options.
(j) The commission shall ensure appropriate valuation of both supply and load modifying demand response resources. The commission, in an existing or new proceeding, shall establish a mechanism to value load modifying demand response resources, including, but not limited to, the ability of demand response resources to help meet distribution needs and transmission system needs and to help reduce a load-serving entity’s resource adequacy obligation pursuant to this section. In determining this value, the commission shall consider how these resources further the state’s electrical grid reliability and the state’s goals for reducing emissions of greenhouse gases. The commission, Energy Commission, and Independent System Operator shall jointly ensure that changes in demand caused by load modifying demand response are expeditiously and comprehensively reflected in the Energy Commission’s Integrated Energy Policy Report forecast, as well as and in planning proceedings and associated analyses, and shall encourage reflection of these changes in demand in the operation of the grid.
(k) For purposes of this section, “load-serving entity” means an electrical corporation, electric service provider, or community choice aggregator. “Load-serving entity” does not include any of the following:
(1) A local publicly owned electric utility.
(2) The State Water Resources Development System commonly known as the State Water Project.
(3) Customer generation located on the customer’s site or providing electric service through arrangements authorized by Section 218, if the customer generation, or the load it serves, meets one of the following criteria:
(A) It takes standby service from the electrical corporation on a commission-approved rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(B) It is not physically interconnected to the electrical transmission or distribution grid, so that, if the customer generation fails, backup electricity is not supplied from the electrical grid.
(C) There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.

SEC. 2.

 Section 399.13 of the Public Utilities Code is amended to read:

399.13.
 (a) (1) The commission shall direct each electrical corporation to annually prepare a renewable energy procurement plan that includes the elements specified in paragraph (6), to satisfy its obligations under the renewables portfolio standard. To the extent feasible, this procurement plan shall be proposed, reviewed, and adopted by the commission as part of, and pursuant to, a general procurement plan process. The commission shall require each electrical corporation to review and update its renewable energy procurement plan as it determines to be necessary. The commission shall require all other retail sellers to prepare and submit renewable energy procurement plans that address the requirements identified in paragraph (6).
(2) (A) Every electrical corporation that owns electrical transmission facilities shall annually prepare, as part of the Federal Energy Regulatory Commission Order 890 process, and submit to the commission, a report identifying any electrical transmission facility, upgrade, or enhancement that is reasonably necessary to achieve the renewables portfolio standard procurement requirements of this article. Each report shall look forward at least five years and, to ensure that adequate investments are made in a timely manner, shall include a preliminary schedule when an application for a certificate of public convenience and necessity will be made, pursuant to Chapter 5 (commencing with Section 1001), for any electrical transmission facility identified as being reasonably necessary to achieve the renewable energy resources procurement requirements of this article. Each electrical corporation that owns electrical transmission facilities shall ensure that project-specific interconnection studies are completed in a timely manner.
(B) Each electrical corporation that owns electrical transmission facilities shall annually prepare, and submit to the commission, a consolidated report on any delays to in-service dates of eligible renewable energy resources or energy storage resources and identify all prudent remedial actions to address and minimize those delays.
(3) The commission shall direct each retail seller to prepare and submit an annual compliance report that includes all of the following:
(A) The current status and progress made during the prior year toward procurement of eligible renewable energy resources as a percentage of retail sales, including, if applicable, the status of any necessary siting and permitting approvals from federal, state, and local agencies for those eligible renewable energy resources procured by the retail seller, and the current status of compliance with the portfolio content requirements of subdivision (c) of Section 399.16, including procurement of eligible renewable energy resources located outside the state and within the WECC and unbundled renewable energy credits.
(B) If the retail seller is an electrical corporation, the current status and progress made during the prior year toward construction of, and upgrades to, transmission and distribution facilities and other electrical system components it owns to interconnect eligible renewable energy resources and to supply the electricity generated by those resources to load, including the status of planning, siting, and permitting transmission facilities by federal, state, and local agencies.
(C) Recommendations to remove impediments to making progress toward achieving the renewable energy resources procurement requirements established pursuant to this article.
(4) The commission shall review each annual compliance report filed by a retail seller. The commission shall notify a retail seller if the commission has determined, based upon its review, that the retail seller may be at risk of not satisfying the renewable energy procurement requirements for the then-current or a future compliance period and shall provide recommendations in that circumstance regarding satisfying those requirements.
(5) The commission shall adopt, by rulemaking, all of the following:
(A) A process that provides criteria for the rank ordering and selection of least-cost and best-fit eligible renewable energy resources to comply with the California Renewables Portfolio Standard Program obligations on a total cost and best-fit basis. This process shall take into account all of the following:
(i) Estimates of indirect costs associated with needed transmission investments.
(ii) The cost impact of procuring the eligible renewable energy resources on the electrical corporation’s electricity portfolio.
(iii) The viability of the project to construct and reliably operate the eligible renewable energy resource, including the developer’s experience, the feasibility of the technology used to generate electricity, and the risk that the facility will not be built, or that construction will be delayed, with the result that electricity will not be supplied as required by the contract.
(iv) Workforce recruitment, training, and retention efforts, including the employment growth associated with the construction and operation of eligible renewable energy resources and goals for recruitment and training of women, minorities, and disabled veterans.
(v) (I) Estimates of electrical corporation expenses resulting from integrating and operating eligible renewable energy resources, including, but not limited to, any additional wholesale energy and capacity costs associated with integrating each eligible renewable resource.
(II) No later than December 31, 2015, the commission shall approve a methodology for determining the integration costs described in subclause (I).
(vi) Consideration of any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code).
(vii) Consideration of capacity and system reliability of the eligible renewable energy resource to ensure grid reliability.
(B) Rules permitting retail sellers to accumulate, beginning January 1, 2011, excess procurement in one compliance period to be applied to any subsequent compliance period. The rules shall apply equally to all retail sellers. In determining the quantity of excess procurement for the applicable compliance period, the commission shall retain the rules adopted by the commission and in effect as of January 1, 2015, for the compliance period specified in subparagraphs (A) to (C), inclusive, of paragraph (1) of subdivision (b) of Section 399.15. For any subsequent compliance period, the rules shall allow the following:
(i) For electricity products meeting the portfolio content requirements of paragraph (1) of subdivision (b) of Section 399.16, contracts of any duration may count as excess procurement.
(ii) Electricity products meeting the portfolio content requirements of paragraph (2) or (3) of subdivision (b) of Section 399.16 shall not be counted as excess procurement. Contracts of any duration for electricity products meeting the portfolio content requirements of paragraph (2) or (3) of subdivision (b) of Section 399.16 that are credited towards a compliance period shall not be deducted from a retail seller’s procurement for purposes of calculating excess procurement.
(iii) If a retail seller notifies the commission that it will comply with the provisions of subdivision (b) for the compliance period beginning January 1, 2017, the provisions of clauses (i) and (ii) shall take effect for that retail seller for that compliance period.
(C) Standard terms and conditions to be used by all electrical corporations in contracting for eligible renewable energy resources, including performance requirements for renewable generators. A contract for the purchase of electricity generated by an eligible renewable energy resource, at a minimum, shall include the renewable energy credits associated with all electricity generation specified under the contract. The standard terms and conditions shall include the requirement that, no later than six months after the commission’s approval of an electricity purchase agreement entered into pursuant to this article, the following information about the agreement shall be disclosed by the commission: party names, resource type, project location, and project capacity.
(D) An appropriate minimum margin of procurement above the minimum procurement level necessary to comply with the renewables portfolio standard to mitigate the risk that renewable projects planned or under contract are delayed or canceled. This paragraph does not preclude an electrical corporation from voluntarily proposing a margin of procurement above the appropriate minimum margin established by the commission.
(6) Consistent with the goal of increasing California’s reliance on eligible renewable energy resources, the renewable energy procurement plan shall include all of the following:
(A) An assessment of annual or multiyear portfolio supplies and demand to determine the optimal mix of eligible renewable energy resources with deliverability characteristics that may include peaking, dispatchable, baseload, firm, and as-available capacity.
(B) Potential compliance delays related to the conditions described in paragraph (5) of subdivision (b) of Section 399.15.
(C) A bid solicitation setting forth the need for eligible renewable energy resources of each deliverability characteristic, required online dates, and locational preferences, if any.
(D) A status update on the development schedule of all eligible renewable energy resources currently under contract.
(E) Consideration of mechanisms for price adjustments associated with the costs of key components for eligible renewable energy resource projects with online dates more than 24 months after the date of contract execution.
(F) An assessment of the risk that an eligible renewable energy resource will not be built, or that construction will be delayed, with the result that electricity will not be delivered as required by the contract.
(7) In soliciting and procuring eligible renewable energy resources, each electrical corporation shall offer contracts of no less than 10 years duration, unless the commission approves of a contract of shorter duration.
(8) (A) In soliciting and procuring eligible renewable energy resources for California-based projects, each electrical corporation shall give preference to renewable energy projects that provide environmental and economic benefits to communities afflicted with poverty or high unemployment, or that suffer from high emission levels of toxic air contaminants, criteria air pollutants, and greenhouse gases.
(B) Subparagraph (A) applies to all procurement of eligible renewable energy resources for California-based projects, whether the procurement occurs through all-source requests for offers, eligible renewable resources only requests for offers, or other procurement mechanisms. This subparagraph is declaratory of existing law.
(9) In soliciting and procuring eligible renewable energy resources, each retail seller shall consider the best-fit attributes of resource types that ensure a balanced resource mix to maintain the reliability of the electrical grid.
(b) (1) A retail seller may enter into a combination of long- and short-term contracts for electricity and associated renewable energy credits. Beginning January 1, 2021, at least 65 percent of the procurement a retail seller counts toward the renewables portfolio standard requirement of each compliance period shall be from its contracts of 10 years or more in duration or in its ownership or ownership agreements for eligible renewable energy resources.
(2) In demonstrating compliance with paragraph (1), a retail seller may rely on contracts of 10 years or more in duration or ownership agreements entered into before January 1, 2019, directly by its direct access, as described in Section 365.1, nonprofit educational institution end-use customer for eligible renewable energy resources located in front of the customer meter to satisfy the portion of the compliance requirement attributable to the retail sales to that end-use customer. A retail seller shall furnish to the commission documentation deemed necessary by the commission to verify compliance with this paragraph.
(c) The commission shall review and accept, modify, or reject each electrical corporation’s renewable energy resource procurement plan prior to the commencement of renewable energy procurement pursuant to this article by an electrical corporation. The commission shall assess adherence to the approved renewable energy resource procurement plans in determining compliance with the obligations of this article.
(d) Unless previously preapproved by the commission, an electrical corporation shall submit a contract for the generation of an eligible renewable energy resource to the commission for review and approval consistent with an approved renewable energy resource procurement plan. If the commission determines that the bid prices are elevated due to a lack of effective competition among the bidders, the commission shall direct the electrical corporation to renegotiate the contracts or conduct a new solicitation.
(e) If an electrical corporation fails to comply with a commission order adopting a renewable energy resource procurement plan, the commission shall exercise its authority to require compliance.
(f) (1) The commission may authorize a procurement entity to enter into contracts on behalf of customers of a retail seller for electricity products from eligible renewable energy resources to satisfy the retail seller’s renewables portfolio standard procurement requirements. The commission shall not require any person or corporation to act as a procurement entity or require any party to purchase eligible renewable energy resources from a procurement entity.
(2) Subject to review and approval by the commission, the procurement entity shall be permitted to recover reasonable administrative and procurement costs through the retail rates of end-use customers that are served by the procurement entity and are directly benefiting from the procurement of eligible renewable energy resources.
(g) Procurement and administrative costs associated with contracts entered into by an electrical corporation for eligible renewable energy resources pursuant to this article and approved by the commission are reasonable and prudent and shall be recoverable in rates.
(h) Construction, alteration, demolition, installation, and repair work on an eligible renewable energy resource that receives production incentives pursuant to Section 25742 of the Public Resources Code, including work performed to qualify, receive, or maintain production incentives, are “public works” for the purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.

SEC. 3.

 Section 454.52 of the Public Utilities Code is amended to read:

454.52.
 (a) (1) Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, and shall ensure that load-serving entities do all of the following:
(A) Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sector’s percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B) Procure at least 60 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C) Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D) Minimize impacts on ratepayers’ bills.
(E) Ensure system and local reliability on both a near-term and long-term basis, including meeting the near-term and forecast long-term resource adequacy requirements of Section 380.
(F) Comply with paragraph (1) of subdivision (b) of Section 399.13.
(G) Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(H) Enhance distribution systems and demand-side energy management.
(I) Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2) (A) The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations’ geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B) The commission may approve procurement of resource types that will reduce the overall emissions of greenhouse gas emissions gases from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3) In furtherance of the requirements of paragraph (1), the commission shall consider the role of transmission, existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources and in achieving the state’s energy goals at the least cost to ratepayers.
(b) (1) Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2) Each electrical corporation’s plan shall follow the provisions of Section 454.5.
(3) The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve all of the following:
(A) Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B) A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related electricity, electricity-related, and demand reduction products.
(C) The resource adequacy requirements established pursuant to Section 380.
(4) The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c) To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d) To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e) This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined based on a three-year average commencing with January 1, 2013.

SEC. 4.

 Section 454.53 of the Public Utilities Code is amended to read:

454.53.
 (a) It is the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100 percent of all retail sales of electricity to California end-use customers and 100 percent of electricity procured to serve all state agencies by December 31, 2045. The achievement of this policy for California shall not increase carbon emissions elsewhere in the western grid and shall not allow resource shuffling. The commission and Energy Commission, in consultation with the State Air Resources Board, shall take steps to ensure that a transition to a zero-carbon electric system for the State of California does not cause or contribute to greenhouse gas emissions increases elsewhere in the western grid, and is undertaken in a manner consistent with clause 3 of Section 8 of Article I of the United States Constitution. The commission, the Energy Commission, the State Air Resources Board, and all other state agencies shall incorporate this policy into all relevant planning.
(b) The commission, Energy Commission, state board, and all other state agencies shall ensure that actions taken in furtherance of subdivision (a) do all of the following:
(1) Maintain and protect the safety, reliable operation, and balancing of the electric system.
(2) Prevent unreasonable impacts to electricity, gas, and water customer rates and bills resulting from implementation of this section, taking into full consideration the economic and environmental costs and benefits of renewable energy and zero-carbon resources.
(3) To the extent feasible and authorized under law, lead to the adoption of policies and taking of actions in other sectors to obtain greenhouse gas emission reductions that ensure equity between other sectors and the electricity sector.
(4) Not affect in any manner the rules and requirements for the oversight of, and enforcement against, retail sellers and local publicly owned utilities pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3) and Sections 454.51, 454.52, 9621, and 9622.
(c) Nothing in this section shall affect a retail seller’s obligation to comply with the federal Public Utility Regulatory Policies Act of 1978 (16 U.S.C. Sec. 2601 et seq.).
(d) The commission, Energy Commission, and state board shall do both of the following:
(1) Utilize Use programs authorized under existing statutes to achieve the policy described in subdivision (a).
(2) In consultation with all California balancing authorities, as defined in subdivision (d) of Section 399.12, as part of a public process, issue a joint report to the Legislature by January 1, 2021, and at least every four years thereafter. The joint report shall include all of the following:
(A) A review of the policy described in subdivision (a) focused on technologies, forecasts, then-existing transmission, and maintaining safety, environmental and public safety protection, affordability, and system and local reliability.
(B) An evaluation identifying the potential benefits and impacts on system and local reliability associated with achieving the policy described in subdivision (a).
(C) An evaluation identifying the nature of any anticipated financial costs and benefits to electric, gas, and water utilities, including customer rate impacts and benefits.
(D) The barriers to, and benefits of, achieving the policy described in subdivision (a).
(E) Alternative scenarios in which the policy described in subdivision (a) can be achieved and the estimated costs and benefits of each scenario.
(e) The commission, in coordination with the Energy Commission, State Air Resources Board, and Independent System Operator, shall identify and advance all interconnection or transmission approvals necessary to address potential capacity shortfalls and achieve the policy described in subdivision (a). The commission, Energy Commission, State Air Resources Board, and Independent System Operator shall execute an accelerated approval and completion process for those purposes.

(e)

(f) Nothing in this section authorizes the commission to establish any requirements on a nonmobile self-cogeneration or cogeneration facility that served onsite load, or that served load pursuant to an over-the-fence arrangement if that arrangement existed on or before December 20, 1995.

SEC. 5.

 Section 913.4 of the Public Utilities Code is amended to read:

913.4.
 In order to evaluate the progress of the state’s electrical corporations in complying with the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3), the commission shall report to the Legislature no later than November 1 of each year on all of the following:
(a) The progress and status of procurement activities by each retail seller pursuant to the California Renewables Portfolio Standard Program.
(b) For each electrical corporation, an implementation schedule to achieve the renewables portfolio standard procurement requirements, including all substantive actions that have been taken or will be taken to achieve the program procurement requirements.
(c) The projected ability of each electrical corporation to meet the renewables portfolio standard procurement requirements under the cost limitations in subdivisions (c) and (d) of Section 399.15 and any recommendations for revisions of those cost limitations.
(d) Any renewable energy procurement plan approved by the commission pursuant to Section 399.13, and a schedule and status report for all substantive procurement, transmission development, and other activities that the commission has approved to be undertaken by an electrical corporation to achieve the procurement requirements of the renewables portfolio standard.
(e) Any barriers to, and policy recommendations for, achieving the renewables portfolio standard pursuant to the California Renewables Portfolio Standard Program.
(f) The efforts each electrical corporation is taking to recruit and train employees to ensure an adequately trained and available workforce, including the number of new employees hired by the electrical corporation for purposes of implementing the requirements of the California Renewables Portfolio Standard Program, the goals adopted by the electrical corporation for increasing women, minority, and disabled veterans trained or hired for purposes of implementing the requirements of that program, and, to the extent information is available, the number of new employees hired and the number of women, minority, and disabled veterans trained or hired by persons or corporations owning or operating eligible renewable energy resources under contract with an electrical corporation. This subdivision does not provide the commission with authority to engage in or regulate, or expand its authority to include, workforce recruitment or training.
(g) A systemwide assessment of delays to interconnection or transmission approvals for eligible renewable energy resources or energy storage resources, based on the annual consolidated reports submitted to the commission by electrical corporations pursuant to Section 399.13.

SEC. 6.

 No reimbursement is required by this act pursuant to Section 6 of Article XIII B of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIII B of the California Constitution.