Bill Text: CA AB1441 | 2023-2024 | Regular Session | Amended


Bill Title: Electricity: electrical corporation procurement plans: resource portfolio.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Failed) 2024-02-01 - From committee: Filed with the Chief Clerk pursuant to Joint Rule 56. [AB1441 Detail]

Download: California-2023-AB1441-Amended.html

Amended  IN  Assembly  March 16, 2023

CALIFORNIA LEGISLATURE— 2023–2024 REGULAR SESSION

Assembly Bill
No. 1441


Introduced by Assembly Member Boerner Horvath

February 17, 2023


An act to amend Section 454.51 of the Public Utilities Code, relating to electricity.


LEGISLATIVE COUNSEL'S DIGEST


AB 1441, as amended, Boerner Horvath. Electricity: electrical corporation procurement plans: integration of eligible renewable energy resources. resource portfolio.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified elements, incentive mechanisms, and objectives. Existing law requires the commission to do various things relating to ensuring the integration of renewable energy resources in the electricity supply. identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Existing law requires the portfolio to rely upon zero-carbon-emitting resources to the maximum extent reasonable and be designed to achieve the statewide greenhouse gas emissions limit.
This bill would make nonsubstantive changes to these commission duties relating to renewable energy integration. specify that a diverse and balanced portfolio of resources includes an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.
Vote: MAJORITY   Appropriation: NO   Fiscal Committee: NOYES   Local Program: NO  

The people of the State of California do enact as follows:


SECTION 1.

 Section 454.51 of the Public Utilities Code is amended to read:

454.51.
 The commission shall do all of the following:
(a) (1) Identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. The portfolio shall rely upon zero carbon-emitting zero-carbon-emitting resources to the maximum extent reasonable and be designed to achieve any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) or any successor legislation.
(2) For purposes of paragraph (1), a diverse and balanced portfolio of resources includes an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.
(b) Direct each electrical corporation to include, as part of its proposed procurement plan, a strategy for procuring best-fit and least-cost resources to satisfy the portfolio needs identified by the commission pursuant to subdivision (a).
(c) Ensure that the net costs of any incremental renewable energy integration resources procured by an electrical corporation to satisfy the need identified in subdivision (a) are allocated on a fully nonbypassable basis consistent with the treatment of costs identified in paragraph (2) of subdivision (c) of Section 365.1.
(d) Permit community choice aggregators to submit proposals for satisfying their portion of the renewable integration need identified in subdivision (a). If the commission finds this need is best met through long-term procurement commitments for resources, community choice aggregators shall also be required to make long-term commitments for resources. The commission shall approve proposals pursuant to this subdivision if it finds all of the following:
(1) The resources proposed by a community choice aggregator will provide equivalent integration of renewable energy.
(2) The resources proposed by a community choice aggregator will promote the efficient achievement of state energy policy objectives, including reductions in greenhouse gas emissions.
(3) Bundled customers of an electrical corporation will be indifferent to the approval of the community choice aggregator proposals.
(e) Ensure that all costs resulting from nonperformance in satisfying the need in subdivision (a) or (d), as applicable, shall be borne by the electrical corporation or community choice aggregator that failed to perform.